Quick Detail
Place of Origin
HS-CODE
84-
Package & Delivery Lead Time
Detailed Description
Aac machine (www.chinablockmachinery.com) introduction
1 Product weight is according to 600kg/m3 to control.
2 annual capacity 300,000M3.
3 set raw material proportion: cement 6.5%, raw lime 23%, flyash 68%, gypsum 3%, aluminum paste powder 350g/M3.
4 water and material rate 0.631
5 one mould product 2.88M3
6 Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7 casting slurry temperature 38-42 degree
8 body quiet stop. Time is 1.5-2.5housr, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa
9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.
10. Cement lime fly ash style aerated block raw material proportion