Quick Detail
Place of Origin
HS-CODE
85-
Package & Delivery Lead Time
Detailed Description
Applicabletoanyhydropower siteswith high water-headover 50m;
Workable for smallwaterdischargespeedless than 1 m3/s;
Whole generating set as one-unitpre-installed insideonecontainer;
Customizable foranyinstalledunit-capacityless than 1,000kW;
Bothfor off-grid (isolated)and grid-tied operation;
Suitable not only for the main cities, towns, villages within the reach of the power grids, but also for small hydropower sitesin remote and mountainous areas, which far away from the power grids.
Important Reminding: The roads to the hydropower site should be suitable for 40ft-container-load shipping.
Unique Features and Advantages: •All the equipments are pre-assembled, pre-commissioned, pre-installed andtotallyincluded inone 40ft container, which replaces the powerhouse;So itgreatly reduces the impact of civil works on the site. •Easier preparationrequired for installation and much less installation period (4 weeks or less): •Less construction costs and shorter con struction period,Less occupation of land; Successful Sample Projects: 1) Shuanglong Containerized Micro Hydro Power Generating Systemin Jinhua, Zhejiang, China Total Installed Capacity: 160kW. 2) Containerized Micro Hydro Power Generating System in a countryside area, Wenzhou, Zhejiang, China Total Installed Capacity: 300kW.
Applicableto any hydropower sites with high water-headover 50m;
1.Workable for smallwaterdischarge speed less than 1 m3/s;
2. Whole generating set as one-unitpre-installed inside one container;
3. Customizable forany installedunit-capacityless than 1,000kW;
4. Bothfor off-grid (isolated) and grid-tied operation;
Suitable not only for the main cities, towns, villages within the reach of the power grids, but also for small hydropower sites in remote and mountainous areas, which far away from the power grids.