Crane_rail_Telescopic_wand

본문 바로가기


Home > Product > Crane_rail_Telescopic_wand
Product
Crane_rail_Telescopic_wand
Posting date : Nov 30, 2011
Membership
Free Member Scince Nov 29, 2011
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
85-
Package & Delivery Lead Time
Detailed Description
Detailed Product Description Insulated Conductors System JDC-H/Single pole conductor rail/Track Configuration: straight /curve elements available. Single pole insulated conductor rails offers a large selection for different applications and number of poles. Standard application data: Max.current(A): 250 - 320 - 500 - 800 - 1000 - 1250 Max.voltage(V): 600 (hand safe array 500 V) Conductor cross section(mm2):100 - 160 - 230 - 300 - 450 - 580 - 600 Outside-Dimensions (Pol) [mm]: 19,0 x 25,0 / 24,0×32,0 / 32,0×42,0 / 38,0×46,0 Leakage-distance(mm):35 - 45(or 80) - 80 Resistance(Ω/km):0.2883 - 0.1922 - 0.1504 - 0.1153 - 0.0769 - 0.0596 - 0.0602 Mechanical properties: Flexible strength:75N/mm2±10% Tensile strength:40N/mm2±10% Temperature range: Common Housing: -30oC up to +60oC BAYBLEND Housing: -20oC up to +115oC Combustibility: Flame retardant Self extinguishing:class B 1-no flaming paricles,self-extinguishing. Standard application data Operating Conditions: for indoor and weather protected outdoor applications Special features High availability in strong industrial enviroment trough several material High level of safety trough insulation profiles with integrated finger safe protection Easy and exact mountig with multiple hangr clamps for (3, 4 and 5 pol) Free and unlimited combination for multiple amount of rails On side bending with optional bending device for curves possible Main applications EOT cranes People Mover Special purpose equipment Maintenance --After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track. --Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable. --Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top