Quick Detail
Place of Origin
HS-CODE
84-
Package & Delivery Lead Time
Detailed Description
Film recycling production line process
1, transportation: The conveyor belt will be transported to film inside the crusher.
2, broken: broken water film will be broken into to meet the requirements of its size. (Water)
3, friction washing: after a break-friction film cleaning and at the same time be transmitted to the washing machine. (Water)
4, rinse: rinse of the film, to deposition of sediment at the same time. The design of sediment device automatically clear. (Water)
5, dehydration: to rinse off dehydration film. (Water)
6, fans: The dehydration of the films have been transported to the next procedure. See the entry in the machine have electric outlet boxes.
7, drying pipeline: to make films in the pipeline for the snake-like movement for full drying of the film.
8, silos: storage of film, at the same time there is a mixing of the film into the mixing device for hot air into the hopper into the dryer to continue to film.