Quick Detail
Place of Origin
HS-CODE
84-
Package & Delivery Lead Time
Detailed Description
We are Hopeland Tech Co.,Ltd. who is professional manufacturer of Aerated-Concrete whole set equipment, who have produced 3.3m, 3.9m, 6m series Aerated-Concrete equipment for Guangdong Province, Henan Province and Zhejiang Province and so on. The Whole set of Aerated-Concrete equipment we produced have become universal products for domestic new or existing aerated factories. Aerated-Concrete whole set equipment are made up of equipment for stocking raw materials, mixing, gating, molding, cutting, evaporating and culturing, crane cramp, transporting etc.
Product Feature
Good thermal insulation
Light
Good capacity of sound insulation
High-precision size, error range ±1.5mm
Non-flammable capacity, safety;
Good processing
Product Specification/Models
I Brief Introduction of producing technics
1.Stocking and supplying raw materials
2.Processing raw materials
3.Proportion, mixing, gating
4.Original cultivating and cutting
5.Steaming with pressure and the finished product
II Power supply, water supply, heating supply
1.Power supply
AC 50Hz,380/220V for the power supply working. The total designed volume is 640kw
2. Water supply
a. For the water: the PH indicator is no less than 4, vitriol acid radical hydronium is less than 27000mg/1, the salt is less than 5000mg/l, no oil or plant oil or sugar or acid are included.
b. The water pressure from the entrance should be no less than 2.5Kg/2 for the workshop water.
c. The biggest water volume is lOm3/H,lOOm3/day.
3. Heating supply
a. The steam for pressure steaming kettle is a system and the volume is 2.4T/H with pressure of 1l~13Kg/cm2
b. The steam for original cultivating room, pouring, mixing and material matching is a system and total volume should be 0.8T/H with pressure of 3Kg/cm2.
Other Information
Technical Service
1.Production Line Design.
Including: drawing of plant working process , drawings of land construction, drawings of power working, drawings of driving force for working, drawings of anti-dust, drawings of water supply and drainage, and drawing of air pipeline construction.
2.Technical Guidance of Building Factory
Including: consultation of facility, Equipment installation guide, constitution the production preparation, etc.
3.Providing the technical information of setting up factory
Including: part of the factory management system, all posts accountability of production line, process rules, safety rules, setting a quota of staff and posts, pre-production tools directory, laboratory instruments, product catalogs, and test methods.