H-Beam Welding Line is used for H-beam assembling; welding, transmitting and 180°turn over. Our H beam steel welding line equipment is composed of assembling equipment, front welder, turn-over device, back welded, and conveying table roller, etc, the production capacity of our H beam welding line is 8000 tons per year.
DELIVERY
The machines will be ready within 60 days (excluding 20 days Chinese Spring Festival holiday) from receipt of the deposit as well as approval of sales contract, technical specification and profile drawing. The shipment will be made within 10 days after the seller receives the balance.
SHIPPING & PACKAGE
2*40GP
TERMS OF PAYMENT
30% of the contract price is to be paid by T/T in advance; the balance is to be paid to seller by T/T before the shipment. Installation charge is to be paid before installation by T/T.