Quick Detail
Place of Origin
Brand Name
GRANVEY
Model Number
GV-0317-80W
HS-CODE
85-
Package & Delivery Lead Time
Package
Each lamp be packed in seperate box, 12 boxes in a
Delivery Lead Time
10-15 working days after payment
Detailed Description
E40 base 80W Aluminum led high bay light for factory warehouse supermarket replacement project
Precautions:
1, when used, has some light surface temperature is a normal phenomenon, light surface temperature is higher, not touch. When you install or use, the lamps do not close to combustible material.
2, in the installation, you must disconnect the power supply when maintenance of lamps.
3, lamps keep the surface clean, help heat lamps can reduce lighting failure and prolong life
Specification:
- - - -
Product Name: E40 Base 80W led high bay light |
Item No. | GV-0317-80W |
Powder Consumption | 80W |
Replace HID Lamp | 150W-200W |
Dimension/Heat sink | 125*220mm |
Lumous flux | 120lm/W |
Power Factor | 0.95 |
LED Power Supply | MOSO driver or High quality driver |
Input Voltage | AC100-305V/50-60Hz |
LED Light Source | CREE XTE3535 |
Color Temperature | 2700~6500K |
Beam Angle | 60 / 90 / 120available |
Color Rendering Index | Ra80 |
Working Life | 50000Hrs |
Working Temperature | -20~60 |
Housing | Aluminum |
Warranty | 5 Year |
OEM | accept |
- - - -
Features:
1,high-power & high efficiencyLED as the light source,low power consumption, good color, power factor> 0.95,dramatically reducing the cost.
2,6063 aluminum shell lamps, lamp surface for oxidation treatment; heat dissipation area, reduce the lamp failure rate and prolong lamp life.
3,each of the joint fixtures are made of high temperature resistant, anti-aging silicone for sealing process.
4,Aluminum or Acrylic Reflector 45 60 90 120 are optional.
Trade Terms:
1). Payment: T/T, Paypal, West Union
2). Production lead time forbulk order: 25days
3).Shipping: Sample order by International Express;Mass order by air or ship
FAQ
Q1. How to improve my lighting system?
A perfect lighting solution,you need follows:
A: a correct luminance standard
B: the position to place the lights
C: correct light beam angle
D: intelligent control system
Q2. How to get a lighting engineering simulation?
We provide solution freely.
Just give information of your place,such as stadium,street,factory...
Q3. How to get a sample?
Please contact us.
Application Areas:
factory, warehouse, workshop, gym, packing garage, gas station, plaza, port, canopy ect.
Contact Info:
- - - -
Cherry Chan /Sales Manager/Granvey
Email :cherrychan@granvey.com
Skype:cherrychan8866
TEL/ Whatsapp:8615972190016
CONTACT US! WE WIll NEVER LET YOU DOWN!
WeChat: cherry719267
Phone:86 027 87671265
Fax:86 027 87671264 |
- - - -