Quick Detail
Place of Origin
Brand Name
BOSHENG
Model Number
BS/EP - 03
HS-CODE
85-
Package & Delivery Lead Time
Package
Use sack package the poles or straw or wood or ste
Delivery Lead Time
15 working days after received the downpayment
Detailed Description
Steel Q345 Hot Dip Galvnaized Electric Power Pole for Low Voltage
Specification
Technical Data Sheet
- - - -
Dimension | 10m | 11m | 11.9m | 13m | 14m | 16m | 18m |
DI(mm) | 210 | 200 | 210 | 210 | 210 | 210 | 210 |
D2(mm) | 455 | 465 | 490 | 530 | 550 | 585 | 620 |
T(mm) | 3.5 | 3.75 | 3.75 | 4.0 | 4.0 | 5.0 | 5.0 |
- - - -
Standard Accessory
-Top Cap
-Base Plate / Bearing Plate
-Bottom Butt Plate / Strip
- Holes as Request
-Climbing Rung
-Anchor Bolt
-Bituminous Painting if Needed.
-Grounding Nuts & Bolts
Description
The fabrication process as cut plate, bending, forming, automatic welding, drill holes, quality check before galvanized, hot dip galvanized or powder coating, final quality check according by client required.
1) Steel materials conform to ASTM A36 with Q235(S235,SS400),Q345(S355JR), Q460,etc
2) Welding: Welding complies with CSA and AWS, AWS D1.1 standard.
3) Finish: Hot-dip galvanized in accordance with ASTM A123.
4) Pole Height: All available
5) Pole shape: Conical, Round, Polygonal---Octagonal, Dodecagonal, Hexadecagonal, etc
6) Type: Straight Pole ,Tensile Pole ,Turn Pole (Double-loop corner pole, Single or double loops/circuit pole, single or double tensile/terminal/straight pole, etc)
7) Surface hot-dip-galvanized & painting
8 Voltage:10-550KV
Available Foundation Types
Direct Embedment / Burial Type
Anchor Bolt / Base Plate
Available Finishing
Galvanized per ASTM A123
Bituminous Painting after Galvanization.
Powder Coating
The information to inquiry or purchase
- Steel pole height and Load
- Pole Type ( Base Plate / Burial Type )
- Cross arm type and length, the position to install in the steel pole
- The method to fix the cross arm
- Safety factor of thepole
- Wind speed
- Type of climbing rung
- Destination port
- Other.
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
EXW: Poles Cost
FOB : Pole Cost + Land Transportation + Fee on Port
CFR : Pole Cost + Land Transportation + Fee on Port + Sea Freight
C I F : Pole Cost + Land Transportation + Fee on Port + Sea Freight + Insurance.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Delivery Time: 15 working days per container after PI / drawing / prepayment confirmed.
5. Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom,or according to clients requirement.