Environmental Testing Equipment 30M Chamber For Air Purifier Solid Contaminant Removal Test

본문 바로가기


Home > Product > Environmental Testing Equipment 30M Chamber For Air Purifier Solid Contaminant Removal Test
Product
Environmental Testing Equipment 30M Chamber For Air Purifier Solid Con...
Posting date : Dec 28, 2017
Membership
Free Member Scince Nov 24, 2017
FOB Price
Customized
Port
Guangdong,China (Mainland)
Payment Terms
L/C, T/T
Package
Customized
Keyword :
Category
Contact
Alex
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Kinte
Model Number
JHQ-1
HS-CODE
85-
Package & Delivery Lead Time
Package
Customized
Delivery Lead Time
Customized
Detailed Description
Environmental Testing Equipment 30M Chamber For Air Purifier Solid Contaminant Removal Test 30m Test chamber of air cleaner Model: JHQ-1 Environment test chamber of air cleaner Overview: According to relevant requirements stipulated in GB/T 18801-2015 Air Cleaner, this device is applied to the solid pollutant removal testing(natural attenuation test of solid pollutants, total attenuation test of solid pollutants, calculation of clean air delivery rate of solid pollutant removal of air cleaner), gaseous pollutant removal test (natural attenuation test of gaseous pollutant, total attenuation test of gaseous pollutant, calculation of clean air delivery rate of solid pollutant removal of air cleaner ), service test of air cleaner and other test. Technical parameters: 1. Dimension: 3400 3500 2500 (3400 3500 2500), allowable tolerance 0.5m 2. Structure: Warehouse board or frame is equipped with glass. 3. Observation window: 1000*700. 4. Door: 2000*800. 5. Sealing material: Use silicon rubber bar and glass sealant with low volatility. 6. Mixing fan: Diameter 1400mm, metal vane, degree of mixing of chamber is greater than 80%. 7. Circulating fan: (500-700)m3/h, diameter 20cm, installation location: 1.5m above the ground, 0.4m away from rear wall. 8. Sampling hole : 3+3 pollutant filling and sampling port: Located at the front wall and the right side wall respectively; ball valve control, with flexible hose. 9. Lighting: 2 sets of cleaning luminaries with dual tubes. 10. Cleaning system (internal cleaning system): Primary efficiency filter screen, intermediate efficiency filter screen, high efficiency filter screen, activated carbon filter screen (activated carbon filter screen of formaldehyde testing chamber shall be thickened properly). 11. Temperature and humidity sensor: Humidity: 30-90%RH3%RH; temperature: 10-50 0.3. 12. Air circulation flow, refrigerating capacity, heating capacity, humidifying capacity and other parameters shall be determined by yourself according to operating conditions said above. However, the time taken from normal temperature to steady working condition shall not be greater than 20min, and the standard temperature is (252) and the relevant humidity is ( 5010)% during test of testing chamber. 13. Power supply of prototype: Single-phase 50-300V, 50Hz, capacity 1kW. 14. Control parameters: Under automatic testing state, all working processes are in accordance with standards.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top