CE Approved 20 Meter Excavator Long Arm Two Pieces High Reach Arm

본문 바로가기


Home > Product > CE Approved 20 Meter Excavator Long Arm Two Pieces High Reach Arm
Product
CE Approved 20 Meter Excavator Long Arm Two Pieces High Reach Arm
Posting date : Dec 14, 2017
Membership
Free Member Scince Nov 20, 2017
FOB Price
Negotiation(EXW,FOB or CIF price)
Port
China
Payment Terms
T/T or L/C
Package
Film
Keyword :
Category
Contact
Irene Guo
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Haide
Model Number
LDB350-1-ZX360-20
HS-CODE
85-
Package & Delivery Lead Time
Package
Film
Delivery Lead Time
Within 25 days after received your payment
Detailed Description
CE Approved 20 Meter Excavator Long Arm Two Pieces High Reach Arm Specifications: - - - - Boomlength | 11000 mm | Armlength | 9000 mm | Maxextensivescope | 19600 mm | Maxdigdepth | 14500 mm | Maxdigheight | 14920 mm | Maxdigdepthinverticalwall | 12680 mm | Maxunloadingheight | 12300 mm | Minrotateradius | 5200 mm | Bucketvolume | 0.8 m3 | Counterweight | 3 ton | Foldingheight | 3300mm | - - - - Note : Because customer said this long reach boom only need to do some very light dredging work,so we prepared a very big bucket (0.8cum) as customer required Description: 1. Long reach boom excavator is very popular and high efficient in dredging work,dredging river,dredging sea,dredging port,etc For dredging river,the excavator usually can stay on the dam or bank of the river to complete the work. For dredging seaand port,usually need to keep excavator stay on a barge to complete the dredging. 2. We specialized in customizing all kinds of long boom for all kinds of excavators. 3.We have detailed dimension of Hitachi ZX360,we can customizelong reach boom for your ZX360 excavator. 4.Main sheet Material of this Hitachi ZX360 long reach boom / arm is Q345B + Q420D,the top and bottom cover plate of boom and stickis Q420D,other sheet is Q345B,Pins material is 42CrMo4. 5.Welding is protective-gas welding,the protective gas is 80% Argon and 20% CO2 mixed.This is golden standard for protective gas 6.For all base,joint and other main structure of the long boom,we use boring machine adjust the precision after welding,to avoid the welding-stress leading to big tolerance. 7. We will prepare lubricant pipe system,hydraulic system,bucket,bucket cylinder,linkage,pins and hoses for the long boom we supply you. 8. This long reach boom,stick cylinder use original stick cylinder to save the cost,if you need the stick cylinder,we also can prepare for you. 9. We prepare 1 kit extra pipe lines for this Hitachi ZX360 excavator. If necessary,we can prepare 1 kit or 2 kit (each kit have 2 pipe lines) extra auxiliary pipe line for theattachments of the long reach boom. 10. The Counter weight of this long reach boom / arm is bottom design,it's easy to use fork lift to install the counter weight. 11. We can prepare camera for the long reach boom ascustomer requirements. Applications: 1. Customer asked a bigger bucket (0.8cum) for this long reach boom,for light dredging river work. 2. After the dredging river project,customer will replace a small bucket (0.6cum) for this long reach boom,then for other projects.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top