Quick Detail
Place of Origin
Brand Name
power system part Copper alloy
Model Number
Ottommo-copper-004
HS-CODE
85-
Package & Delivery Lead Time
Package
parts in carton, cartons in pallet
Delivery Lead Time
20-25 working days after PO
Detailed Description
Power system partCopper alloy
Description
We use the way of copper die casting to do this part.
- - - -
Item | Description |
Product Name | power system casting copper alloy |
Working Process | Tooling make, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
Material | copper alloy |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | electric power system |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
- - - -
Payment & Shipping Terms:
- - - -
Minimum Order Quantity: | 800 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 40,000pcs per month |
- - - -
FAQ:
Q: Who Are We?
1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.
Q: What is the payment?
We prefer T/T, and also L/C if you want, the way of payment we can discuss.
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be with 20 working days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
LOWER PRICE:
The price of our products is reasonable and competitive, and we can discuss if you want.
Why should you choose us?
1. We can do the part according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).
3. 100% inspection before delivery.
4. Competitive price with high quality.
5. Convenient transportation ( port: Ningbo, Shanghai)
6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.