Quick Detail
Place of Origin
Brand Name
drilling bit
Model Number
Ottommo-C-1045-1
HS-CODE
85-
Package & Delivery Lead Time
Package
parts in carton, and cartons in pallet
Delivery Lead Time
20-25 working days after PO
Detailed Description
Drilling bit 1045 carbon steel investment casting parts silicon casting
Description
Investment casting is a way of casting, which is cmposed of wax mould, shell mold, pouring, after treatment and package, whose lead time will be 20-25 working days after PO.
- - - -
Item | Description |
Product Name | drilling bit |
Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
Material | 1045 carbon steel |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | a drilling in the electric tool |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
- - - -
Payment & Shipping Terms:
- - - -
Minimum Order Quantity: | 900 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
- - - -
FAQ:
Q: Who Are We?
1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.
Why should you choose us?
1. We can do the part according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).
3. 100% inspection before delivery.
4. Competitive price with high quality.
5. Convenient transportation ( port: Ningbo, Shanghai)
6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.
Q: What is the lead time?
If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
If do the mass production, the lead time will be with 20 working days after receiving the PO.