organic fertilizer production process

본문 바로가기


Home > Product > organic fertilizer production process
Product
organic fertilizer production process
Posting date : Mar 16, 2017
Membership
Free Member Scince Mar 16, 2017
FOB Price
3500 USD
Min. Order Quantity
1
Supply Abillity
100
Port
Qingdao
Payment Terms
L/C,T/T, D/P
Package
1 set per pack
Keyword :
Category
Contact
Elena Forbes
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Allance
HS-CODE
8427-10
Package & Delivery Lead Time
Package
1 set per pack
Delivery Lead Time
within 25 days after receive the deposit
Detailed Description
Organic fertilizer Production Process Mixing original and auxiliary materials Mixing livestock manure,biogas residue or crop stalks and inoculum,controlling moisture ranges about 50% to 60%.The stack width is 3 meters,height is about 1.2 meters to 1.4 meters, length is unlimited.
 

Mixing original and auxiliary materialsMixing livestock manure,biogas residue or crop stalks and inoculum,controlling moisture ranges about 50% to 60%.The stack width is 3 meters,height is about 1.2 meters to 1.4 meters, length is unlimited.Measuring temperature of windrowAfter materials piling up, test the temperature and moisture of windrow on time(every day at8:30 am, 12:30pm, 4:30pm). Make accurate records and temperature and moisture variation curve, as the basis of next process.CompostingAccording to the results of the temperature,when there is a pause or decrease tendency, composting with the compost turner(from upper and surface to the bottom and center). Carefully, completely compost to reach the function of crushing, volatile moisture, oxygenation and improving microbial propagation. Composting timely and 48 hours one time. High temperature can remain above 20 days. Through the continuous high-temperature and 12-14 times of composting to add the water evaporation. Make sure the moisture of windrow is about 45%.After ripeningAfter stack fermentation and maturation is 15-20 days,placing the windrow semi-finished products storage semi-finished products storage 15-20 days. Crushing it until the moisture volatilizes reaches the national standard.CrushingBefore the finished products are packaged,refining the semi-finished products by using screening machine to remove inclusions.Qualified standard≤2.0Testing finished productsProceeding according to NY525-2002,testing the moisture of the finished products, PH value, organic materials content  and total  nutrient content(N+P2O5+K2O) to ensure the production quality.Weighing, packaging ,storingWeighting and packaging by model CM50 automatic fertilizer packing machine, each pocket about 25kg ±0.5kg,(the label of the package according to GB 18382,storing after packaging and putting at cool and dry place. To the products packed, weighting and checking the sample products each 2 month, prevent losing weight.


ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top