APEC Hydraulic Ironworker AIW-250

본문 바로가기


Home > Product > APEC Hydraulic Ironworker AIW-250
Product
APEC Hydraulic Ironworker AIW-250
Posting date : Nov 25, 2015
Membership
Free Member Scince Nov 25, 2015
FOB Price
29500
Min. Order Quantity
1
Supply Abillity
30 Per Month
Port
Shanghai
Payment Terms
TT. L/C
Package
Film Plastic Package
Keyword :
Category
Contact
lulu@cnapec.com
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
APEC
HS-CODE
8462-41
Package & Delivery Lead Time
Package
Film Plastic Package
Detailed Description
APEC Brand AIW series Ironworker features multiple functions, including: punching all kinds of holes (round hole, square hole, oblong hole), louver punching, steel plate punching, flat bar punching, angle steel punching, C-channel punching, H-beam punching, I-beam punching, profile steel shearing (channel shearing, I-beam shearing, round/square bar shearing, flat bar shearing, T-bar shearing, steel plate shearing, angle steel shearing), notching, press brake, angle steel notching , bending, pipe notching. It comes standard with: quick-change coupling nut & sleeve, squaring arm with scale, electronic back gauge, gauging table with stops, punching base table, safety guards and more.We can design any special tools according to your metal fabricating requirements.
 
 
APEC Brand AIW-S series is improved machine on the base of standard AIW series. It goes along with automatic holding system and temperature cooling system.
Automatic Holding System: There is automatic holding system in angle steel shearing and plate shearing work position. The holders will fix the position of work-piece, in this way, the accuracy is better and more safety for workers meanwhile save time and Improve working efficiency. Temperature cooling system: Once start the machine,the cooling system starts working automatically.The hydraulic oil temperature always stays at 60 degree or less.It is applicable and safety for processing in quantities and long time.
 
 
 
Features
1. High Quality Components & System
a. Main Electrical component: Schneider, Germany.b. Valve: Yuken, Japanc. Pump: Atos, Italyd. Oil Seals: NOK, Japane. Timer Relay: OMRON, Japanf. Wiring Terminal Block:WEIDMULLER, Germanyg. Motor: Weiteli, China
2. Cost Effective
AIW SERIES Hydraulic Ironworker With Very good price/performance ratio
Various AIW SERIES Hydraulic Ironworker capacity from 45T to 400T to meet your requirement.
3. Stable Performance & Reliable Quality
AIW Series Hydraulic Ironworker use hydraulic transmission. Light weight, low noise, reliable performance.
4. Simple Operation
The operation of hydraulic ironworker is controlled by foot switch.
 
 
Technical Parameters:
 
Technical Parameter
No.
Item
Unit
Value
1
Hole Punching
Punching Pressure
Kn
2500
Max. Punching Thickness
mm
40
Max. Diameter of Punching
mm
40
Depth of Throat
mm
560
Max. Length of Cylinder Stroke
mm
100
Stroke Times
times/min
8-25
2
Flat-bar Shearing
Angle of Shear
degree
Max. Shearing Thickness
mm
40
Flat Bar (W×T)
mm
450x40
750x30
3
Angle Steel Shearing
90° Shearing of Equal Angle Steel
mm
200x200x20
45° Shearing of Equal Angle Steel
mm
80x80x10
4
Profile Steel Shearing
Round-bar
mm
80
Square-bar
mm
65x65
I-beam
mm
320x130x10
C-channel
mm
320x92x12
5
Notching
Thickness
mm
20
Width
mm
60
Depth
mm
100
6
Material Tensile Strength
N/mm2
450
7
Motor Power
KW
18.5
8
Overall Dimensions(L×W×H )
mm
3200x1440x2450
9
Gross Weight
Kg
12800
Note:Design and specifications subject to change without notice.
 
 
 
Accessories:
a. A pair of round hole punching die
b. A set of angle steel blade
c. A set of square and round bar blade
d. A set of shearing plate blade
e. A set of notching blade
The above punching and moulds will be installed in the machine.
For other dies and blades, customers need to order
Installation & Operation Training
APEC will provide you 1-7 day installation and operating training in our factory.
 
Training After-sales service
1. Technical documentsAll labels on machines and lay-out drawings, Electrical diagram, Operation Manual, will be in English. The seller should send all necessary files to the buyer since the third week since project execution. All documents in hard copies should be also shipped with machines together.
2. Arrangement for inspection, installation and testing worka. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.b. The buyer will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer’s factory.c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.d. Engineer will give free training lessons to labors in buyer’s factory.
3. Quantity and quality guaranteea.Quantity/Quality Discrepancy to destination port during transportation:In case of quality/quantity discrepancy to destination port in transportation, the buyer should file claim within 30 days after the arrival of the goods at port of destination. The seller will not be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.b.Guarantee period and after-sales services: 13 months since date of bill of ladingDuring this guarantee period, the seller will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, the seller will provide the buyer spare parts at cost price.c.Long-term service:The seller will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
 
FAQS:
1. Payment Terms
T/T, L/C at sight are acceptable by us.
2. Price Terms
It is up to your requirement. EX-WORS, FOB, CIF, CFR and so on are acceptable  by us.
3. Delivery Time
25 working days from our accountant confirm your deposit payment.
4. Shipment Condition
We will arrange the machine production from our accountant confirm your deposit payment. The deposit is 30% of the contract. The balance should be paid up before loading machines.
5. Warranty
13 months quality guaranty for the main spare parts, not include quick-wears parts, like blade, punch, die and so on. If the parts of machines have problems, which are caused by its own quality, we will provide the accessories for free.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top