Quick Detail
Place of Origin
HS-CODE
85-
Package & Delivery Lead Time
Detailed Description
EU plug 12v 24v wall mount poe adapter:
Input Voltage: 100~240V
Output: 12V1A 12V2A 24V1A 24V1.25A
AC plug: US/EU/UK/AU available
MTBF: 50, 000~100, 000h
RJ45 LAN - to LAN cable
RJ45 Poe - to Poe device
Direct connection to ac power outlet
Dimensions: 84X48X32mm
Operating Temperature 0C~+40C
Storage Temperature -20C~+85C
Suggested applications: Router Board equipment, Power over Ethernet, etc.
Quality control:
6 full inspection:
Plug-in board full inspection : to make sure no components in wrong place, no reverse components, no components left, etc
Semi-finished products full inspection: to make sure no cold solder ,lack of components, no tin dross, no short-circuit, no open circuit, no bad led indicator ,no high voltage, no low voltage, no output, etc
Assembly full inspection: to make sure every unit with power ,without low voltage, without bad led indicator, low ripple, good appearance, with right cables, etc
Full inspection after burn-in: to make sure every unit with high temperature resistance, with power ,no bomb unit, no high voltage, no low voltage, no bad led indicator, etc
Finished products full inspection: to make sure every unit with power, no high voltage, no low voltage, no bad led indicator, low ripple, with right cables , no bad ultrasonic bonding, etc
Visual full inspection: to make sure no scratched case, no cracked wires ,no missing screw, no label misaligned, etc
3 sampling inspection:
IQC (incoming quality control): According to AQL-MIL-STD-105E level II standard, to make sure raw materials up to international standard.
IPQC (input process quality control): Tooling/fixture change or change over will do initial confirm,Position inspection will do per 2 hours. To make sure the whole production process under control, avoiding mistake in bulk.
OQC (outgoing quality control): According to AQL-MIL-STD-105E level II standard. To guarantee every unit in good quality before arrive at our customers.
100% full load burn-in test for 1 hour,doing shock test per 10 minutes for 20 second. To make sure no bomb unit, every unit work at normal temperature, etc.