EU plug 12v 24v wall mount poe adapter

본문 바로가기


Home > Product > EU plug 12v 24v wall mount poe adapter
Product
EU plug 12v 24v wall mount poe adapter
Posting date : Oct 25, 2013
Membership
Free Member Scince Oct 25, 2013
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
85-
Package & Delivery Lead Time
Detailed Description
EU plug 12v 24v wall mount poe adapter: Input Voltage: 100~240V Output: 12V1A 12V2A 24V1A 24V1.25A AC plug: US/EU/UK/AU available MTBF: 50, 000~100, 000h RJ45 LAN - to LAN cable RJ45 Poe - to Poe device Direct connection to ac power outlet Dimensions: 84X48X32mm Operating Temperature 0C~+40C Storage Temperature -20C~+85C Suggested applications: Router Board equipment, Power over Ethernet, etc. Quality control: 6 full inspection: Plug-in board full inspection : to make sure no components in wrong place, no reverse components, no components left, etc Semi-finished products full inspection: to make sure no cold solder ,lack of components, no tin dross, no short-circuit, no open circuit, no bad led indicator ,no high voltage, no low voltage, no output, etc Assembly full inspection: to make sure every unit with power ,without low voltage, without bad led indicator, low ripple, good appearance, with right cables, etc Full inspection after burn-in: to make sure every unit with high temperature resistance, with power ,no bomb unit, no high voltage, no low voltage, no bad led indicator, etc Finished products full inspection: to make sure every unit with power, no high voltage, no low voltage, no bad led indicator, low ripple, with right cables , no bad ultrasonic bonding, etc Visual full inspection: to make sure no scratched case, no cracked wires ,no missing screw, no label misaligned, etc 3 sampling inspection: IQC (incoming quality control): According to AQL-MIL-STD-105E level II standard, to make sure raw materials up to international standard. IPQC (input process quality control): Tooling/fixture change or change over will do initial confirm,Position inspection will do per 2 hours. To make sure the whole production process under control, avoiding mistake in bulk. OQC (outgoing quality control): According to AQL-MIL-STD-105E level II standard. To guarantee every unit in good quality before arrive at our customers. 100% full load burn-in test for 1 hour,doing shock test per 10 minutes for 20 second. To make sure no bomb unit, every unit work at normal temperature, etc.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top