GTF System with High Construction Efficiency for Bridge Deck Construction

본문 바로가기


Home > Product > GTF System with High Construction Efficiency for Bridge Deck Construction
Product
GTF System with High Construction Efficiency for Bridge Deck Construct...
Posting date : Oct 21, 2013
Membership
Free Member Scince Oct 21, 2013
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
S02-
Package & Delivery Lead Time
Detailed Description
Detailed Product Description bridge deck formwork mivan aluminium formwork permanent formwork systems GTF System with High Construction Efficiency for Bridge Deck Construction Description: 1. Brief introduction GTF system is a kind of compositional formwork system, it is especially for the bridge floor construction. GTF is composed of two sub system: formwork system and traveling machine. 2. Competitive advantage ①.High construction efficiency The formwork system is easily to assembling, in the procedure of construction, crane is not depended. The movement of formwork is achieved by traveling machine. ②. Good safety performance The formwork system is not needed to dismantle and move by auxiliary tool or machine, and there are all-around operation platforms, all this makes GTF system in good safety performance.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top