Quick Detail
Place of Origin
HS-CODE
73-
Package & Delivery Lead Time
Detailed Description
Structure Parts:
Body, Sealing, Follower, Linited short pige, Nut, Long Bolt, Short Bolt
Product performance:
The product is manufactured through welding or metal casting, and the loosing part is sealed by echelon ring rubber. Operated by gland and bolt and based on the principle of rubber`s elastic deformation under pressure, the seal ring will be deformed and static seal will be done between joint body and expansion pipe wall. According to clients demand and product performance, metal and seal ring mate- rails will be selected strictly. High- strength antifouling paint is painted outside and the joint bolt is made of high- strength carbon steel or stainless steel, since there is some space between body and expansion, so axes and radial displacement will appear. Inside pipes, it becomes available to compensate and release pipe blind plate propulsion and makes it easy to maintain and change pump and valve. Therefore, it is an ideal matching product for pipes installation and operation.
Applicable Scope
The metal product is functioned with pull and pres-sure resistance and excellent seal performance and easy installation. Hence it is widely used in power, metallurgy, drainage and sewage disposal to connect pump, vale and pipe, etc. It also has some multi-directional displacement during pipes operation so as to release blind plate propulsion and protect pipes, especially it makes it easy to install and maintain pipes. However, force- transferring joints shall be used on the pipe corner and pump exit, because, the joints can transfer blind plate propulsion from pump start to pump and pipe through force- transferring bolt and prevent pull to centralize close to pipe or pipe or damage equipment by impact force. Other joints can be selected freely for other positions. Our tenet: Your trust is our honor and we will manufacture high- quality products for you.
We can design and make the products according to your drawings and techincal requirements. The quality is better and the price is lower than the similar products another company make.
Delivery time:
Within 30 days after receipt of the deposit, or as your request
Packaging trem:
Unfumigation wooden case (Out package) and Plastic film and Textile membrane(inside package). We can make change as your request.