Anchor chain accessories-lifting shackles,IJIN ACC10

본문 바로가기


Home > Product > Anchor chain accessories-lifting shackles,IJIN ACC10
Product
Anchor chain accessories-lifting shackles,IJIN ACC10
Posting date : May 09, 2013
Membership
Free Member Scince Oct 22, 2012
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
72-
Package & Delivery Lead Time
Detailed Description
lifting shackles and cable connection. 1. Anchor, the anchor chain and accessories recipients to installation site, the first of goods, inventory check. Organization owner, ChuanJian field supporting steel seal number, and check the cable section correctness, check the accuracy of the stainless steel mark and chain appearance situation. 2. Field construction matters needing attention A. fore the berth position to clear out the enough space, with the aid of crane every day chain tile apart, and in accordance with the manufacturer has prepared link mark order, first will be interconnected chain A head of A tail put together, Easy to link connection. B. lifting shackles minor details at the end of the chain link from the mooring line machine into the mooring line tank fixed in abandon chain device, the rest of the chain and chain, anchor and anchor in turn connected into the chain locker. A responsible for loading with start mooring line machine, open the stopper loosen the brake (electric anchor machine for hydraulic brake) accept anchor and anchor cable, electrical fit power inspection. Cristiano anchor and anchor cable, cable and cable connection between, the first with taper pin punch exit taper pin, with the same diameter specifications of the rail impact block and wedge remove Kent shackle, first of all use rail impact block flush out rail, then use rail impact block and wedge to cooperate, Kent shackle fluctuation two and a half ring separate. In lifting shackles of two and a half circle are installed on one end of the chain ring, will be up and down half ring alignment, put is then load rail and scored taper pin. D. will Ken typecast shackle, end shackle, lifting shackles, rotating shackle of taper pin into the taper pin hole, and position after appropriate with lead plug seal end. E. lead plug with heating methods will lead after melting fill taper pin hole pit, prevent taper pin off. (hole asphalt paint, oil pollution, etc must be clean up)

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top