Dual Completion Wellhead

본문 바로가기


Home > Product > Dual Completion Wellhead
Product
Dual Completion Wellhead
Posting date : Sep 25, 2012
Membership
Free Member Scince Sep 21, 2012
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
72-
Package & Delivery Lead Time
Detailed Description
detailed description •Can complete with different (pneumatic) hydraulic safety valve. •Design with assembling and disassembling dual tubing hanger quickly. •One well bore can exploit two different strata at the same time, and can control and operate separately. • Compact configuration, convenient operation, reliable seal. •Apply to all kinds of casing and tubing program. •Working pressure 2000PSI~20000PSI •Working medium: oil, natural gas, mud ,including H2S,CO2 •Working temperature: -46°C~121°C(Class LU) •Material class: AA、BB、CC、DD、EE、FF 、HH •Specification level: PSL 1-4 •Performance level: PR 1-2

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top