Quick Detail
Place of Origin
HS-CODE
88-
Package & Delivery Lead Time
Detailed Description
2012 The 5th Session Shanghai International Airport Facilities Construction and Operation Exhibition
Time: April 1 –April 3, 2012
Site: Shanghai Everbright Convention & Exhibition Centre
Approved: Civil Aviation Administration of China
Host organizer: China Dual-Use High-Tech Industry Association
China Clean Energy Association
Supporter: Airport Department of Civil Aviation Administration
East China Regional Administration of CAAC
Airport construction and operation network
Professional Committee on Airport Ground Special Vehicles, Materials & Equipment
Sponsor: Shanghai Electric (Group) Co., Ltd.
Undertaker: Shanghai Zhenwei Advertising Co., Ltd.
◆Chinese civil aviation develops constantly and rapidly, the scope of transportation is expanding. Since 2005, the total Chinese civil aviation transportation turnover (excluding Hong Kong, Macao and Taiwan) has maintained the second place in the world. The total investment of Civil Aviation Authority during the period of the 12th Five-Year Plan will exceed $ 1.5 trillion, the investment increased by 50% relative to the period of 11th Five-Year Plan, 56 new airports, 16 airports transferred, 91 airports transferred and extended, a total of 163 projects, more than 1,900 aircrafts. It is expected that by the end of period of "the 12th Five-Year Plan", the traffic volume of passengers will reach 450 million people; the number of transport airport will reach more than 220 (175 currently); fleet size rose from more than 2600 currently to over 4500. Local governments will greatly support the development of the aviation industry. By 2020, Chinese civil aviation will achieve over 140 billion tons km of total transport turnover, passenger transport volume over 700 million people, the proportion of passenger turnover will account for 25% in the national integrated transport system. Civil Aviation Administration further proposed to build new generation of civil air transportation system recently, the system will make full use of emerged modern communications, precise positioning, computer networks, computer-aided decision-making and other advanced science and technology to introduce, digest and absorb innovative road. I. Airport construction equipment and technology:
◆Products Displayed:
1.Wastewater treatment 2.Hangar design and construction 3.Planning, consulting and construction 4.Technical equipment installation 5.Other activities such as consultation and construction-depot technology 6.Runway design and construction 7.Power supply and cable 8.Waste collection and processing lifting platform, overhead working truck, airport logistics, airport elevator, communications equipment, airport new energy bus and so on. II. Ground support equipment and services: 1. Aircraft engine starter and PCA system 2.Aircraft processing system 3.Aircraft towing 4.Airport service equipment 5. Baggage loading 6.Cargo processing 7.Accident, fire and rescue 8.Loading and unloading systems (crane and lifter board) 9.Mobile cargo processing system (vehicle and push cart) 10.Passenger transport 11 Water supply and toilet truck 12.Other ground support equipment and services- aircraft deicing 13.Aircraft refueling 14.Aircraft wash 15.Baggage handling 16 Baggage transport 17.Food and beverage equipment 18.Conveyer belt technology belt 19.Maintenance (cleaning machine and lawnmower) 20.Passenger handling 21.Power supply 22.Winter service III. Technology system: 1.Aircraft maintenance 2 Environmental control (noise and flight testing) 3.Labeling system 4.Surface treatment 5.Other technologies and services 6.Airport lighting 7.Maintenance system (scaffolding and test bench) 8. Navigation help 9.Tool and equipment IV. Terminal construction and installation: 1. Access technology (door) and control system 2.Baggage handling 3.Baggage scanning, self-service check-in system 4.Cargo processing 5.Check-in system and technology 6.Consulatation 7.Aircraft information display system 8.Loading equipment 9.Parking (all devices) 10.Passenger information technology 11.Public broadcast system 12.Security system (alarm and fire control) 13 Technical installation 14.Warehousing and distribution system 15.Architecture 16. Luggage protection system 17.Baggage cart and management system 18.Process check-in desktop and counter 19.Building 20.Lift and transport channel 21.Lighting and HVAC 22.Control terminal 23.Passengers handling 24.Passengers scanning and monitoring 25.Safety inspection equipment 26.Fixed cargo system and accessories 27. Terminal infrastructure 28.Other technical equipment and services. V. Terminal interior decoration: 1.Ground 2.Store 3.Furniture 4.Decorative materials (faucet, ceramic), etc.
4. Other terminal equipment VI. Related services: 1. Association 2. Property management 3.Other services. VII. Consultation institute: 1. Magazine and information. VIII. Information technology: 1. Air traffic control equipment and technology 2. Baggage management 3 Internet service 4.Traffic and operation management 5. Airport management 6.Cargo management 7.Passenger management 8. Other software and services
◆Activities:
“China Civil Airport Development Forum ” - there will be many manufacturers, purchasers and professional people in the aerospace field from home and abroad present in the exhibition, the exhibitors can fully use the advantages of the big people flow, news media focus to develop a series of publicity and promotional events, fully attract people’s attention and increase the enterprise’s popularity. The organization committee of the exhibition will also separately organize the “Product Introduction Meeting”, “New Technology Promotion Meeting” and other professional technical exchange activities for the exhibitors according to circumstances. Each seminar: 45 minute, Chinese enterprises: RMB 10,800/each; Foreign enterprises: EURO 2,000/each.