Alloy Steel Tube

본문 바로가기


Home > Product > Alloy Steel Tube
Product
Alloy Steel Tube
Posting date : Jul 08, 2011
Membership
Free Member Scince Jun 24, 2011
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
27-
Package & Delivery Lead Time
Detailed Description
■ Specification & Steel Grade: ASME SA213M: T11, T12, T22, T2,T5, T9, T91 etc; ASME SA335M: P11, P12, P22, P2,P5, P9, P91 etc; ASME SA199M: T11, T12, T5 etc; ASME SA209M: T1, T1a, T1b; EN10216-2: 10CrMo5-5, 11CrMo9-10 etc; JIS G3462: STBA12, STBA13, STBA24 etc; ■ Size: OD 1/2”to 16”WT 1.0 to 40.5mm, Length Max.12 Meters; ■ Application: For Heat Exchanger, Superheater and Boiler. Test and inspection perfomed: Chemical Composition Mechanical Properties Dimension and Visual Test Non-destructive Examination Sulfide Stress-cracking Test Delivery Condition:Annealed, Annealed Stress Relieved, Cold Drawn/Hard, Cold Drawn/Soft, Normalized, Clean Annealing. Surface treatment:Oil, Vanish, Shot Blasting,etc. 1) Cold drawn seamless steel tube/pipe 2) Certificate:ISO9001:2000,PED,API 5L, API 5CT, TS16949,Mill Test Certificate EN10204/3.1B 3) O.D: 1/2"-4"(19.05mm-114.3mm, NB10-NB100) 4) W.T:2mm-14mm 5) Max length:16m 6) Package:bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes (Surface treatment:Oiled, black painted, shot blasted, hot dipped galvanized or phosphate coating) 7)Third party inspection: BV, SGS, Lloyds 8) Capacity:3500ton/month 9)Delivery: FOB / CFR / CIF Delivery Lead Time: 30-60days 10)Payment: TT 30% or 100% Irrevocable LC at sight 0086 13921994182-->Bossling Chris.hwsteel (at)gmail(dot)com

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top