light steel villa&house

본문 바로가기


Home > Product > light steel villa&house
Product
light steel villa&house
Posting date : Jul 28, 2010
Membership
Free Member Scince Jul 28, 2010
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
S02-
Package & Delivery Lead Time
Detailed Description
This is the kind of villa with safety, comfort, long lasting life and high performance. We can supply various designs according to the requests of the clients and produce them by standard production. Advantages: 1. Credible quality, accurate sizes and convenient installation: The difference for installation is no more than 3mm. Except the foundation construction, all the installation is done dryly, no wet construction in site. 2. Saving power resources: Comparing with the brick and concrete houses, it can save power resources above 65 percent. Very good insulation ability. 3. Good insulation and soundproof: This house was designed with the system of complete close type, with good insulation and soundproof or moisture proof materials. It can keep 17 degree centigrade. 21 degree centigrade inside when 30 degree centigrade outside. It is only 40dB inside when it is 80dB of noise outside. 4. Long lasting life, earthquake retardant and wind retardant: Galvanized or rustproof painted Square tube and H profile steel is used for the main structure. Its life can last more than 50 years. The house can resist the invasion from white ants. The resisting seismic intensity is 2 to 3 times of 8. Wind speed resisting: 60m per second. 5. Good environment protection, economical and reusable: It is clean at the construction site. There's very less noise, dust or construction wastes. Construction can't be influenced by seasons. It can save time and man power for construction. The reusing rate of the main structure is over 60 percent. 6. Light deadweight, short time and convenient construction: The deadweight is only one fifth to one seventh of the brick and concrete buildings which can decrease much cost of the foundation. The construction time is only 30 percent of the brick and concrete buildings.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top