Project: The Steel Bridge Project of the Rapid Distribution and Collection System of Shanghai Hongqiao Hub.
Summary
The 22 km long road is vital important in the new Hongqiao Hub, which is designed to work as a new transportaion center in Hongqiao disctrict, connecting G42/G2 (from west/north), G60/G92/G15 (from south/southwest) with Hongqiao airport and Shanghai Meglev.
The critical requirements include: to do pre-assembly at shop, to transport the 4.5-meter wide steel members to Shanghai and erect the bridge at downtown area. The errection completed early 2010, and the bridge is opened to public before May, 2010, the opening of World EXPO 2010.
Project Specs
Project Type: Steel Bridge
Steel Tonnage: 2,800T
Steel Grade: Q235 and Q345
Coating: painted
Project Team
Project Owner: Shanghai Municipal Authority
Designer: Shanghai Municipal Engineering Design Institute
Detailer: Huaxing Steel Structure Co., Ltd.
Steel Fabricator: Huaxing Steel Structure Co., Ltd.
Steel Erector: Huaxing Steel Structure Co., Ltd.
Place of Origin Ningbo, China
Standard GB,ASTM,DIN,JIS,BS,AISI
Type Heavy Duty
Welding Arc submerging, carbon dioxide arc, electroslag
Currency Settlement USD, EUR
Steel Grade Q235B, Q345B
Weight Measurement Actual Weight
Design by customer or by us
Shop Detailing by us
Surface Treatment Shot Blasting
Painting 1/2 layers of primer
Payment Terms L/C or 50% as DP, 50% against the copy of B/L
Vadility of quotation 15 days
Transportation by truck/vessel in bulk or container
Welding Testing Ultrosonic, X-ray