GreenHome Pre-passivation film

본문 바로가기


Home > Product > GreenHome Pre-passivation film
Product
GreenHome Pre-passivation film
Posting date : Nov 21, 2009
Membership
Free Member Scince Nov 20, 2009
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
38-
Package & Delivery Lead Time
Detailed Description
GreenHome Pre-passivation film Pre-passivation film is dedicated lift the oil boiler, metal surface passivation treatment, pre-membrane. A major role: degreasing, passivation of metal surfaces, pre-membrane. Use: the use of newly installed boiler or pipes. Specifications: The appearance of white powder solubility and water miscibility Packaging Specifications: 10L plastic barrels, room temperature stability, and shelf-life of three years. Usage: 1, the amount of: the use of the concentration of 2000 ~ 5000mg / L. 2, will be provided for the preparation of the goods in the concentration of aqueous solution, adding the boiler temperature to 60 ℃ for more than 24 hours can be passivated. Note: 1, when prepared in aqueous solution, to avoid direct contact with the skin, not to splash into the eyes. Operation should wear protective masks and rubber gloves, If the splash on the skin or eyes, rinse immediately with plenty of water. Tel 8610-63856889 63803121 or EMAIL---biqing10@sina.com; contact Mr. Su, 861013366752361 www.chinaqingjie.com Skype: biqing100 MSN: biqing100@hotmail.com QQ: 363615790

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top