M Frame scaffolding

본문 바로가기


Home > Product > M Frame scaffolding
Product
M Frame scaffolding
Posting date : Aug 03, 2009
Membership
Free Member Scince Aug 03, 2009
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
S02-
Package & Delivery Lead Time
Detailed Description
M frame scaffolding COMPONENTS OF ASSEMBLING 1planks Clean site and lay the wooden planks at the ground in horizontal position 2.Jack base It is a base seat for adjusting and fixing the required scaffolding length above the wooden planks. 3.Main frame insert the main frame into jack base section in per pendicular position 4.cross brace for fixing the main frame in each span of scaffolding 5.joint pin insert into the top of main frame for joining the required dimension 6.Horizontal frame or catwalk/steel plank it is a lateral pipe frames used for fixing the main frame to complete the first floor scaffolding.(It can be erected with about 2 to 4 spans in each high rising floor alternately.)

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top