Simple Production Line

본문 바로가기


Home > Product > Simple Production Line
Product
Simple Production Line
Posting date : May 08, 2009
Membership
Free Member Scince May 08, 2009
Keyword :
Category
Contact
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
HS-CODE
S02-
Package & Delivery Lead Time
Detailed Description
Introduction of Simple Production Line Stage 1. Raw material batching Manual -handle trolly (2 sets), Carry sand, scree, cement etc. To mixer Stage 2. Concrete mixing Mechanical -concrete mixer Prepare concrete for block making machine Stage 3. Block making Auto -concrete belt conveyer Carry concrete to storage hopper -concrete storage hopper Store concrete for block making machine -PX-QT/M block making machine Produce concrete blocks -hydraulic station provide strong oil pressure power for actions of block making machine -pallet feeder Provide pallet to block making machine -block conveyer Carry fresh blocks&pallet out from block making machine Stage 4. Block curing Manual -wheel trolly (about 3 sets) Carry blocks&pallet to curing area, then to block storage area Stage 5. Block cubing Manual Stage 6. Pallet returning Manual Control System 1 PLC It control the working condition of concrete belt conveyor, concrete storage hopper, hydraulic station, block making machine, block conveyer, movable stacker, and pallet feeder. Curing Way Natural Curing I 2 days at curing area, be kept moist by sprinkling with water, then be moved outside to block storage area for at least 25 days before selling Workers Needed 12 2 for aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 4 for moving block&pallets to trollies and bringing them to curing area; 3 for moving cured blocks to blockstorage area, cubing blocks and collecting pallets there; 1 for carrying pallets to block making machine. Accessories -one arm lift for installation and changing of molds -bamboo pallets (about 1600 pcs) for blocks to be produced on until be cubed away after be cured. Comparing with other production lines, this production line needs the lowest equipment investment, with machinery bought from our company, customer can produce blocks and doesn't need to prepare any other equipments. The installation, commission and personnel training needs about 2 weeks. All PLC controlling equipments and the mixer, and the 2 handle trollies and 3 wheel trollies will be provided by our company.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top