Steel Structure

본문 바로가기


Home > Product > Steel Structure
Product
Steel Structure
Posting date : Oct 30, 2024
Membership
Free Member Scince Oct 30, 2024
FOB Price
700-900USD/ton
Min. Order Quantity
50 tons or 1000m2
Supply Abillity
150,000 t steel structure/year
Port
Qingdao / Tianjin
Payment Terms
T/T, L/C
Package
steel frame or pallet
Keyword :
Category
Contact
Amy Zhu
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
JINYU STEEL
HS-CODE
7308-90
Package & Delivery Lead Time
Package
steel frame or pallet
Detailed Description

1. Information for Steel frame building:

Standard

ASTM , BS , DIN , GB , JIS

Material Grade

Q235 & Q345 ( S235JR & S355JR )

Dimensions

Yours requirements

Place Of Origin

Shandong China ( Mainland )

FOB Price

US $ 20 - 150 / Square Meter

Port

Qingdao

Minimum Order Quantity

100SQM

Supply Ability

1000 Ton / Tons per Month

Payment Terms

L/C ,T/T

Quality Control

The third party , SG S , ASIA INSPECTION all accept

Delivery Term

Within 20 days after signing contract

Packaging 

According yours requirement , usually bundle with steel strip

Delivery Container

20'GP , 40'GP , 40'HQ , 40'OT

Our Experience

Have exported for 13 years , clients from all over the world

 


2. Our products scope include:

Single layered light and MID-sized workshops and warehouses, Steel building, single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc

  

3. Project case- Uganda Steel Coil Processing Plant:

Detailed introduction

Project Description: 30x 120M

Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc

Time: Oct. 25, 2012

Location: Uganda

Description:

Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client' s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.

 

4. Trial Assemblies to ensure smooth erection on project site:

Our plant is fitted out with large working areas for major assembly work of steel structures and oversized built-up components

In order to ensure the optimal installation of the steel structures on-site, trial assemblies of various and unique steel pieces with complex geometry forming part of a built-up component, are performed in the plant prior to their delivery to site.  In addition to validating the quality of the design, the compliance with engineering parameters and fabrication accuracy, these trial assemblies add great value for the client since they mean potential time and cost savings with regard to installation work on site.

To successfully carrying out trial assemblies of large steel components, our fabrication complexes have been fitted out with large production areas and state-of-the-art equipment as well as measurement method, which are integrated in Tekla Structures 3D software, thus ensuring the quality control of its products.

  

5. FAQ:

1) Why should I build steel building using steel structure ?

Steel has the higher strength.

80% recyclable, Steel is the most recycled material in the world.

No warping, no cracking, no chemical treatments.

Stronger connection.

Lower transport costs due to lightweight frames.

Steel frames will not burn, fire proof.

Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.

Each steel structure is a independent engineered.

 

2) How difficult is it to install Steel building?

Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.


ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top