Excellent and High Quality Infrared Lamp Heating Spray Paint Booth

본문 바로가기


Home > Product > Excellent and High Quality Infrared Lamp Heating Spray Paint Booth
Product
Excellent and High Quality Infrared Lamp Heating Spray Paint Booth
Posting date : Apr 17, 2023
Membership
Free Member Scince May 04, 2022
FOB Price
$5600
Min. Order Quantity
1
Supply Abillity
3
Port
qingdao
Payment Terms
15
Package
western union
Keyword :
Category
Contact
Hellen Jia
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Captain
HS-CODE
8424-89
Package & Delivery Lead Time
Package
western union
Detailed Description

Inside Dimension 10000×5000×4000 mm(L×W×H)   Outside Dimension 10100x6350x4400mm(LxWxH)
Front Door  4000×3600 mm(W×H), metal sheet panel door, bolt inside, strong hinge, sealing strip, 5mm glass 4 folds color: white, blue, red, orange
Service Door  700×2000mm(W×H), 1 unit with 2 sets pressure lock , 5mm glass  
Basement  No basement
 
Wall Panel 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels,  Tongue and groove interlock structure. 
Ceiling Panel 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels,  Tongue and groove interlock structure. 
Ceiling system Two cotton frames near the air inlet use punching technology to reduce air volume 
Intake&Exhaust System 1x7.5kw turbo fan for air intaking, air capacity is 28000 -30000m3/h; 1x7.5kw turbo fan for exhausting, air capacity is 28000 -30000 m3/h; The frame is soldered by 50mmx50mm square tube and with powder coating.  Standard 3m air duct . 
Lighting System Ceiling Lights: 10units×4pcs=40pcs×16W LED lights  
Side Lights: 12units×2pcs=24pcs×16W LED lights                Illumination≥1000Lux. 
Heating System Italy Riello FS20 gas burner, 200000Kcal/h. Stainless steel heat exchanger, max temperature: 80ºC. The burner need the Natural gas as resource to heat air and then the hot air go throught heat exchanger to the room. (Please note that we only provide the burner and its accessories. Customers need to complete the connection between the burner and the gas pipeline with the help of local electrical engineers.)  
Purification System Pre-filter: on the air inlet to prevent large dust and other impurities;
Ceiling filter: on the ceiling frame to prevent much smaller dust, make sure the air is clean Fiberglass floor filter:  under grilles. To prevent paint mist go outside                                              Activated carbon filter: on air outlet. To absorb paint smell                                                              4 kinds of flters to protect workers and environment. 
We also put activated carbon particle to help absorbing paint smell. 
Controlling System without inverter type : spray&baking switch, time setting, lighting switch, temperature controller, power supply switch, emergency stop, breakdown alarm, Differential pressure gauge ,etc. All electrical parts are from SCHNEIDER. 
 with inverter type : spray&baking switch, time setting, lighting switch, temperature controller, power supply switch, emergency stop, breakdown alarm, Differential pressure gauge ,etc. All electrical parts are from SCHNEIDER. 
Total Power 18 KW


ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top