1.high automation with PLC, photoelectric detection for the raw material feeding to avoid wasting and with high stability.
2.import cutting roll, no burr and durable in use
3.Material feeding by sever motor , accurate in ear loop position adjustment and welding. small in size, solid and rustproof performance with aluminum alloy frame rack.
4.20k ultrasonic ear loop welding, strong in welding portion and pulling.
5.Patent equipment, leading technology,mature process,stable quality and high efficiency.
It is fully
automatic production line from raw materails feeding, transparent film welding,
face mask melt cutting, to ear loop weding and finished mask collection. waste
collection device is available. The special feature of the mask is that the
position of the mouth is changed to an open design, that is a transparent
film is placed to facilitate others, especially the hearing
impaired, to communicate with the lips as usual. auto packaging function and
CCD detection system will be optional. easy opearation and as well as compact
size.
Machine
Size |
7730*5330*1670mm |
Output |
25-30 pcs/min |
Voltage |
220
V/380V |
Power |
5.8 KW |
Pressure |
0.6 Mpa |
Fuselage
material |
Aluminium
alloy |
Special
requirement |
Mask
size need to be fixed |
Note |
Stracking
and auto packaging is optional |
Note |
Optional
machine, waste collector is available |
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer’s requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.
5) Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.
6) Provide one year guaranty and lifetime maintenance.
1. Q: How is the after sales service?
A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.
3. Q: What’s the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-45 days.