MMA Two-Component Colorful anti-skid Pavement Marking material (MMA Cold Plastic)

본문 바로가기


Home > Product > MMA Two-Component Colorful anti-skid Pavement Marking material (MMA Cold Plastic)
Product
MMA Two-Component Colorful anti-skid Pavement Marking material (MMA Co...
Posting date : Oct 22, 2018
Membership
Free Member Scince Oct 12, 2018
FOB Price
USD 4200/ton
Min. Order Quantity
1 ton
Supply Abillity
800 tons/month
Port
Shanghai
Payment Terms
T/T
Package
25 kg/drum
Keyword :
Category
Contact
Vicky Yao
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Shanxi Zhongtu
Model Number
---
HS-CODE
9701-
Package & Delivery Lead Time
Package
25 kg/drum
Delivery Lead Time
7 days after payment
Detailed Description
Introduction:
Advantage:
*  Good visuality and colorful;
*  Good anti-skid and can improve the pavement anti-skid in the rainy day;
*  No VOC,environmental protection,energy conservation
*  Compressive strength,anti-wear,good adhesion;
*  Excellent  aging resistance ,cold resistance;
* Weather resistance,anti-oil,anti-acid,anti-alkali.
 
This materials has four construction modes.
First (Three layers -- covering antiskid layer)
During construction:
Step 1. Worker use scraper with toothed to coat primer;
Step 2. At the same time to strew the anti-skid aggregates above the coating primer;
Step 3. After the primer drying,sweeping the redundant anti-skid aggregates on the primer and use the              paint or resin as the top coat.
Consumption (Actual consumption depends on the roughness of  Pavement )
 
The thickness of colorful anti-skid road marking is 3mm
Consumption (surface temperature 25℃)
Primer
Top coat
Aggregates
Hardner
2.5kg/㎡
1kg/㎡
4.5kg/㎡
3g/㎡
 
Second (Two layers)
During construction:
Step 1. Worker use the scraper with the toothed to coat primer;
Step 2. At the same time to strew the anti-skid aggregates above the coating primer;
Step 3. After the primer drying,sweeping the redundant anti-skid aggregates on the primer.
 
Consumption (Actual consumption depends on the roughness of  Pavement )
The thickness of colorful anti-skid road marking is 3mm
Consumption (surface temperature 25℃)
Primer
Aggregates
Hardner
2.5kg/㎡
4.5kg/㎡
4g/㎡
 
Third(single layer--Can add the sand)spraying application
During construction,using the worker or with the air assisted spraying equipment to overlay the road.
 
Fourth  (Hybrid)
During construction:
Step 1.Mix the paint & aggregate and the mixture evenly;
Step 2.Then worker use the scraper to screed evenly;
Step 3.Finally using roller to evenly brush the surface of marking.
 
Technical Data:
·Curing time:≤60 minutes
·Anti wearing valve:≤10mg
·Anti slide swing valve:≥65BPN
·Flexibility:≤1
·Crack resistance in low temperature:In -40℃ no crack after three cycles
Color:Various colors / Customize color

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top