MMA Two-Component High-light Pavement Marking material (MMA Cold Plastic)

본문 바로가기


Home > Product > MMA Two-Component High-light Pavement Marking material (MMA Cold Plastic)
Product
MMA Two-Component High-light Pavement Marking material (MMA Cold Plast...
Posting date : Oct 22, 2018
Membership
Free Member Scince Oct 12, 2018
FOB Price
USD 3969/ton
Min. Order Quantity
1 ton
Supply Abillity
800 tons/month
Port
Shanghai
Payment Terms
T/T
Package
25 kg/drum
Keyword :
Category
Contact
Vicky Yao
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Shanxi Zhongtu
Model Number
---
HS-CODE
9701-
Package & Delivery Lead Time
Package
25 kg/drum
Delivery Lead Time
7 days after payment
Detailed Description
Introduction:
Advantage:
*  Material from Evonik Industries;
*  Excellent brightness and night visibility;
*  Anti-crack & strong tenacity;
*  Wear resistance is 2 times better than thermoplastic marking;
*  Excellent aging resistance;
*  Environment protection,100% solid content and no volatile substances.
 
Construction mode includes spraying application and screed application and extruded application.
Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )
 
surface temperature 25℃
Spraying application
(0.5mm-0.7mm)
Screeding application
(1.2mm-1.5mm)
thickness
0.6mm
1.2mm
paint
1kg/㎡
3kg/㎡
Hardner
15g/㎡
45g/㎡
primer
150g/㎡
 
Glass beads
0.5kg/㎡
0.5kg/㎡
 
Dosage table of curing agent (Used in B component)
Paint
Hardner
Surface temperature(℃)
Ratio of BPO
Surface dry time    (Min)
Curing time  (Min)
B component
White color
powder
5
750g-800g
25
50
15
700g-750g
20
35
25
650g-700g
10
20
35
550g-600g
8
15
 
 
Technical Data:
·Retroreflective valve:≥350 mcd(white)
·Curing time:≤15minutes
·Density (g/cm³):2
·Abrasion resistance:≤35mg
Color:White/Yellow /Customize other colors
 
The matters needing to attention during the construction
  • Dry & Clean & flat of road surface.
  • Damaged road should be repaired before applying.
  • Before applying,should add the hardner according to the ratio to the MMA two-component (Component B) pavement marking paint,then stir well.
  • Avoid breathing vapors,eyes and skin should not touch the coating.
  • During Construction,eating and drinking and smoking is prohibited.
 
Attention of construction
1. Clean and dry road surface.
2. Construction environment temperature is about 10℃ to 40℃,surface temperature generally is
    above 5 ℃。
3.  The curing time depends on the consumption of curing agent & the temperature of construction
     environment,but has nothing to do with the thickness of the coating.
4.  Strictly prohibited from direct sunlight during transport and storage,stored in ventilated and shade
     and dry place,the storage temperature should be controlled in 0℃ to 40℃.
5.  During screeding application,it is recommended that two scraper buckets be equipped for continous
     replace.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top