Dust - Proof Small Server Rack Cabinet / Rack Mount Server Cabinet Low Noise YH2004

본문 바로가기


Home > Product > Dust - Proof Small Server Rack Cabinet / Rack Mount Server Cabinet Low Noise YH2004
Product
Dust - Proof Small Server Rack Cabinet / Rack Mount Server Cabinet Low...
Posting date : Jun 04, 2018
Membership
Free Member Scince Apr 28, 2018
FOB Price
negotiable
Port
CHINA
Payment Terms
L/C, T/T, W
Package
cartons and PU box
Keyword :
Category
Contact
Johnson Hao
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
YUHUI
Model Number
YH06
HS-CODE
96-
Package & Delivery Lead Time
Package
cartons and PU box
Delivery Lead Time
10 work days
Detailed Description
Noise isolation and ventilation and heat dissipation Data Rack YH2004 Preparatory preparation First, the user should be notified to organize the cabinet without affecting the normal work of the user. Then according to the topological structure of the network, the existing equipment, the number of users, the user grouping and other factors to outline the internal wiring diagram of the cabinet and equipment location map. Next, prepare the necessary materials: network jumpers, label sheets, and various types of plastic ties (legged dogs). 2. Organize the cabinet Install the cabinet: Need to do the following three things by yourself: First, use a screw and a nut with a random frame to tighten the holder; second, turn the cabinet down and attach the movable wheel; and thirdly, according to the position of the device Holders adjust and add baffles. Finish the line: Group network cables. The number of groups is usually less than or equal to the number of cable management shelves behind the cabinet. Bundle the power cords of all the devices, insert the plugs from the rear through holes, and look for the respective devices through a separate cable management arm. Fixed equipment: Adjust the baffle in the cabinet to a suitable position so that the administrator can see the operation of all devices without opening the cabinet door, and add the baffle appropriately according to the number and size of the devices. Take care to leave some space between the baffles. Place all the switching equipment and routing devices used in the cabinet in the pre-drawn drawings. Cable labeling: After all network cables are connected, each network cable needs to be marked, the ready-made sticky tape is wrapped around the cable, and the pen is used to mark it (usually indicate the room number or what purpose is used), and the identification is required to be easy to understand. The crossover cable can be distinguished by using different colors of sticky notes and general network cables. If there are too many devices, the devices must be numbered and labeled. 3. Late work UMC test: When it is confirmed to be correct, turn on the power supply and perform the network interconnection test to ensure the normal operation of the user. This is the most important. Document update: Update the contents of the cabinet's finishing. Redraw the equipment layout and network connection diagram. In the figure, the number of the equipment and the identification of the network cable should be indicated for inspection. It is best to add the user name as an item to the graphic. Finally, date and line managers. -We enjoy to be very high trust factory in China,and local administration always give honour to us; -Let us have a nice start,please type you idea;

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top