Quick Detail
Place of Origin
Brand Name
CNC Milling Machine, CNC Turning Machine
HS-CODE
83-
Package & Delivery Lead Time
Package
Carton, Wooden Case.
Delivery Lead Time
Depends on the quantity
Detailed Description
OEM car wheel parts precision cnc machining services machine shop
What is your product range?
1. CNC machining parts, precision parts, CNC parts, metal machining parts.
2. CNC turning parts, CNC turned parts, Lathe parts, turned parts.
3. CNC milling parts, CNC milled parts, metal milling parts.
4. CNC machined parts, CNC machine part, CNC machinery parts.
5. Metal parts, Auto parts, mechanical parts. spare parts, accessories, hardware.
6. Sheet metal fabrication, bending parts, laser cutting parts, welding parts.
What is material you can process?
Stainless steel: SUS303, SUS304, SUS316, SUS316L, SUS430, SUS440, etc
Aluminum: 6061-T6, 6063-T5, 7075-T6, 2011, 2017, 2024, 5052, 5083, 6082 etc
Brass/copper: C11000, C10200, C12000, C26000, C36000, etc
Carbon steel: Q235,S235JR,1010, 1015, 1020, 1025, 1030, 1035, 1040, 1045, etc
Plastic: PVC, POM, Telfon, Delrin, PEEK ,Nylon, ABS, PC, PP,PA6, PA66, etc
Mild steel: 1211, 12L13, 12L14, 1215, etc
Tool Steel: SKD61,SKD11,HSS M2,ASP23 ,H13,1.2344,D2,1.2379,etc
Alloy steel: 40Cr,15CrMo,4140,4340,35CrMo,16MnCr5
Titanium alloy
Whats your advantage?
1) Competitive price
2) High quality control : 100% full inspection before shipment.
3) High precision, tolerance can be 0.005mm
4) Fast lead time (5-7days for samples, 12-40 days for mass production)
5) Non-standard, OEM, customized services provided
6) No MOQ, small QTY order is welcome.
7) ISO 9001:2015certificated factory, using ROHS materials.
How long does the quotation take ?
Firstly please provide us detail drawings including information such as material, surface finish, quantity, etc
After that, we will send you quotation within 24 hours.
Can we get some samples?
Sure, we also highly recommend you to try some samples before mass production.
How does Kinsai control product quality?
# # During processing, the machine operators inspect each dimension by themselves firstly.
# After finished the first whole part, QA people will do a full dimensional inspection until everything is ok
# We will do regular inspection from picking up the parts made on production site. In case of any problem, machine operators and engineers will make adjustment in time so as to avoid large scale NG products.
# Before shipment, the QA will inspect according to ISO sampling inspection standard for mass production. Will do 100% full checking for small quantity orders.
# when shipping the goods, we will attached the inspection report with the parts.
What's the payment term?
50% deposit, and balance by T/T before shipment when order amount over 3000USD.
100% T/T in advance when amount less than 3000USD
L/C payment term for big amount order is acceptable.
Paypal and Western Union for sample cost or small order payment.
What's the delivery time ?
Normal for samples, 5-7 working days;
For mass production, it takes about 12-15 working days.
If any urgent parts, we can provide preferential processing and control the delivery time as you required.
How will you pack the goods?
1) Blister box, Foam, Bubble Wrap, etc, we do most fine packing as to prevent products from damage during transportation.
2) Under 100 KGS parts, use strong export outer carton .
3) Above 100 KGS, will customize wooden case for packing.
Can you provide paper documents formaterials?
Yes, we can provide RoHS compliance document of materials if you need.
Some surface finish documents are defaulted to attach with the goods.
How do you handle customer complaints?
In case of any quality complaints after you get the goods, please show us photos and detail complaints points, we will check and confirm quickly, and finally give our solution within 24 hours.
If making replacement was needed, we would arrange production urgently and send you replacement as fast as we can. We do our best to guarantee customers right.
- - - -
| For customer information: |
Item | CNC machining parts, precision CNC machined parts, CNC turning parts, CNC milling parts, Metal parts. |
CNC parts, CNC machinery parts, Mechanical components, Auto parts, Metal parts, |
Metal stamping parts, Sheet metal fabrication |
Materials | Aluminum, Stainless steel, Brass, Copper, Carbon steel, Plastic (POM,PVC,PEEK,PU etc) |
Alloy steel, Tiantium, Iron, spring steel, Bronze. |
Surface treatment | Anodized, Passivation, heat treatment, painting, Power coating, Black Oxide, Silver/Gold plating |
Electrolytic polishing, Nitrided, Phosphating, Sandblasting, Nickel/Zinc/Chrome plated. |
Application Industry | Aerospace, Automotive, Medical, telecommunications, electronic, military, packing, |
Sensors, Optical instruments, computers, Motorcycles etc. |
Processing method | CNC machining, CNC turning, 3/4 axis CNC milling, wire-cutting, EDM, grinding. |
Drilling, Tapping, welding, bending , stamping and etc. |
Quality control | 100% full inspection |
Tolerance | High precision:(+/-) 0.005mm / ISO2768-m |
Certificates | RoHs |
Lead time for samples | 5-7 working days |
Lead time for orders | 12-40 working days |
Shipping | DHL, FedEx, UPS, by air or by sea |
Packing | Blister, foam, carton, or wooden boxes, etc |
Sea Port | Guangzhou / Shenzhen/ Hong Kong |
Payment term | T/T,L/C, PayPal, Western Union |
Drawing format | JPG, PDF, DWG, DXF, STEP, IGS etc. |
- - - -
- - - -
|
OEM car wheel parts precision cnc machining services machine shop |
- - - -