This steel mill rail transfer trolley is usually used at ship yard, plant and factory, certain production line. It is powered by the cable drum. Recently, the steel mill rail transfer trolley was developed to dramatically reduce the material handling requirements of cranes and fork trucks while providing quick, safe and smooth movement of materials and/or products through manufacturing facilities.
Customized:
Model | BJT-2t | BJT-20t | BJT-50t | BJT-100t | BJT-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Heigth(H) | 500 | 600 | 700 | 1000 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 | |
Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 0.8 | 2.5 | 5.5 | 11 | 15 | |
Running Distance(m) | 25 | 30 | 50 | 50 | 50 | |
Max Wheel Load(KN) | 14.4 | 77.7 | 174 | 343.8 | 265.2 | |
Reference Weight(t) | 2.5 | 5.6 | 7.8 | 14.1 | 26.2 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
1. Q: What is the size and load of this steel mill rail transfer trolley ?
A:The size and load of our this steel mill rail transfer trolley is customized design according to your requirement.
2. Q: How should I operate this steel mill rail transfer trolley ?
A: The steel mill rail transfer trolley is controlled by pendant & remote radio control. The controller could be push button or joy-sticker.
3. Q: Is there any braking system on this steel mill rail transfer trolley ?
A: Yes, there are electromagnetic brakes on the steel mill rail transfer trolley. When the steel mill rail transfer trolley is power off, the brake will work automatically. And there are emergency stop buttons on the remoter and the steel mill rail transfer trolley, you can push it for emergency stop.
4. Q:What is the warranty period? What kind of service do you offer in the warranty period?
A: The warranty period for our product is 12 months from the time we delivery, during the warranty period, we will send spare parts to you on our own cost if damaged because of bad quality, and we will guide you how to replace it. If necessary, our engineer is available to your factory for maintenance.
5. Q: How do you transport the steel mill rail transfer trolley and what is the package ?
A: For the big part, we will pack it with tarpaulin and wood pallet on the bottom of the steel mill rail transfer trolley to prevent it from moving. For the small part, we will pack it in wood case.
6. Q: What is the leading time, delivery term, and payment term ?
A: Usually our leading time is 45 days, for some special steel mill rail transfer trolley, such as hydraulic lifting steel mill rail transfer trolley, it maybe longer to 60 days. About the delivery term, we accept EXW, FOB, CIF, DDU. About the payment, we accept T/T or L/C.