Solid OD31.8 Mm L/LL/KL Type Fin Tube , Overlapped LL Foot Soldered Fin Tube

본문 바로가기


Home > Product > Solid OD31.8 Mm L/LL/KL Type Fin Tube , Overlapped LL Foot Soldered Fin Tube
Product
Solid OD31.8 Mm L/LL/KL Type Fin Tube , Overlapped LL Foot Soldered Fi...
Posting date : Oct 16, 2017
Membership
Free Member Scince Sep 25, 2017
FOB Price
Negotiable
Port
JIANGSU,CHINA
Payment Terms
T/T in Adva
Package
Strong plywood case with steel frame
Keyword :
Category
Contact
April Guan
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
JYCT
Model Number
LL-1
HS-CODE
83-
Package & Delivery Lead Time
Package
Strong plywood case with steel frame
Delivery Lead Time
Within 45 days after received your deposits
Detailed Description
LL Fin (or Overlapped) fin tube Base tube material: SA179 SMLS OD31.8mm * 2.7mm THK * 4000mm LG Fin Material: AL1060; OD57.2mm X 10FPIX0.4 mm THK Application: LL-type finned tube mainly used in petrochemical, electric power, paper making, tobacco, building heating and other industry such as air cooler, air heater and air heater of food industry, plant starch spray drying system. Manufacturing Process: The fin is wrapped around the tube with an overlapping foot and secured at each end, making the trapezoidal cross-section forming by rolling combine closely with the heat flux density distribution size. The fins combine tightly with the tube,which makes the thermal efficiency higher and put an end to thermal resistance that brings by the non eliminate contact from segment gap of the string type finned tube.and gives good surface protection to the tube. Used for moderate temperature coolingapplications. Working temperature: 230 Reference Drawing : Material: Copper, Carbon Steel, Copper Stainless Steel, Alloy, Aluminium Bare tube OD: 16-63mm Fin Pitch: 2.1-5.0mm Fin Height: <17mm Features: The winding technology improves production efficiency and heat transfer, makes the average fin pitch and higher proportion between fins and tube. At the same time, the base tube can be protected from air erosion. - - - - Name | Base tube (OD) mm | Fin Pitch (mm) | length (m) | | Min | Max | Min | Max | Min | Max | Extruded aluminum fin tube | 8 | 51 | 1.6 | 10 | 0.5 | 20 | L/LL/KL aluminum fin tube | 16 | 63 | 2.1 | 5 | 0.5 | 15 | Embedded aluminum fin tube | 16 | 63 | 2.1 | 5 | 0.5 | 15 | Low fin tube | 10 | 38 | 0.6 | 2 | 0.5 | 20 | Spiral fin tube | 12.7 | 70 | | | 0.5 | 20 | ERW HF spiral fin tube | 16 | 219 | 3 | 25 | 0.5 | 28 | ERW HF spiral serrated fin tube | 16 | 219 | 3 | 25 | 0.5 | 28 | | Serrated width(mm) 10 min~26 max | Serrated depth(mm) 4 min~16 max | ERW studded tube | 25 | 219 | 8 | 30 | 2 | 15 | | | | | | | | DC ERW H/HH fin tube | 25 | 63 | 8 | 30 | 1 | 15 | H/HH fins | Length(mm) 60 min-150 max | Thickness(mm) 1.5 min~4 max | Width(mm) 30 min~50 max | - - - - Capacity: 9000 meters/day Products&Inspection Deatails: TPI REPORT BY BV Following documentations should be reviewed & endorsed: Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip Mill test cetification for bare tube Mill test cetification for fin (alu.tube / alu. strip / steel strip) Mill test cetification for finned tube Finned tubes dimension & visual inspection reports Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins Manufacturing FAQ About our company A------We have three company, 1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China) 2.Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill) 3.Jiang Yin Aare International Trading Co.,Ltd. (for export procedure) Besides the companies above mentioned, we dont have any other name. About Our main business A------DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube; High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube; Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube. About Price terms A------It could be EXW, FOB,CIF,CNF About Payment Term A------We usually accept payment by T/T in advance or by L/C available against draft at sight About Lead Time A------Usually it takes about 35-45 days after we received your confirmation. However, it would depend on our production line schedule(the timing clients place order)and the complication of the item. About Quality Control A---- Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip Mill test cetification for bare tube Mill test cetification for fin (alu.tube / alu. strip / steel strip) Mill test cetification for finned tube Finned tubes dimension & visual inspection reports About Sample A---If you are interested in our above products, please contact us. We can provide small samplesin storefor you, and you are welcome to visit visit our factory Our moulds can be customized,you could kindlyleave an inquiry to know more details about price, packing and shipping.

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top