Headers And Manifolds Rings Boiler Manifold Headers Cyclone Spparator Front And Rear Circular

본문 바로가기


Home > Product > Headers And Manifolds Rings Boiler Manifold Headers Cyclone Spparator Front And Rear Circular
Product
Headers And Manifolds Rings Boiler Manifold Headers Cyclone Spparator ...
Posting date : Oct 11, 2017
Membership
Free Member Scince Sep 13, 2017
FOB Price
Negotiable
Port
China
Payment Terms
L/C, T/T, W
Package
Seaworthy Packing
Keyword :
Category
Contact
Sandy Chen
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
HD Boiler
Model Number
Double H Fin Tube
HS-CODE
83-
Package & Delivery Lead Time
Package
Seaworthy Packing
Delivery Lead Time
50 Days
Detailed Description
Boiler ring header Alloy steel cyclone spparator front and rear circular mainfold header Product Description 1.Headers form an important part of all types of boilers. 2.Steam from the generating tubes is collected in headers which are therefore always under pressure. 3.This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. 4.Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header. 1.In manufacturing, the key of end cover hinder is welding. 2.Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. 3.In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. 4.When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Details 1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine. 2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure. Features 1. Strength calculation report with applied materials information. 2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod. 3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler. 4. Hydraulic test report: ensure the standard working pressure and safety. 5.Excellent in welding quality, highly automatic, safe and reliable. Classification - - - - Material | Carbon steel,Alloy steel,Stainless steel. | Length | According to costumes requirements. | Temperature Range | 300~1500 | Diameter(OD) | 76mm~914mm | - - - -

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top