Quick Detail
Place of Origin
Brand Name
SHIBO
Model Number
2W and 3W highway guardrail road usage purlin roll forming machine
HS-CODE
83-
Package & Delivery Lead Time
Package
Nude, with waterproof cloth and stow-wood. The com
Delivery Lead Time
The seller guarantees the equipment will be ready for shipment within 30 working days after receipt of deposit from the buyer
Detailed Description
2W And 3W Highway Guardrail Road Usage Purlin Roll Forming Machine 1, Appliciation:
This machine takes GI as raw material, through a series steps and can produce the metal Purlin. Use PLC system controls length and quantity automatically, therefore, the machine achieves a continuous automatic production, which is the ideal equipment for cold roll forming industry.
2, Advantage of our equipment:
1) We use Taiwan quality.
2) Adopting advanced world famous brand components in computer parts. Like siemense, schneider,etc.
3) Running in a high automatization and intellectualization,no pollution.
4) Our company can customize the equipment based on your profile with szies.
3, Our equipment description:
- - - -
Article No. | Item Name | Specification |
1 | Feeding width | Customize based on your detailed design |
2 | Thickness of Raw material | 2mm-4mm |
3 | Roller station | 18 Steps |
4 | Shaft Diameter | 90-100mm |
5 | Productivity | 0-12m/min |
6 | Rollers' material | 45# Steel with chrome coated |
7 | Shaft material | 45# Steel with chrome coated |
8 | Weight | 6.0tons |
9 | length | 10m |
10 | Voltage | 380V 50Hz 3phases ( also can do based on you need) |
11 | Control system | PLC control system |
12 | Decoiler weight capacity | 5Tons |
13 | Main Motor | 11KW |
14 | Driving way | Chain transmission |
15 | Chain size | 2.0 inch |
16 | Cutting system | Hydraulic Automatic hydraulic cutter+Front cutter to reduce raw material waste |
- - - -
4, Working processing:
DecoilerRoll Forming MachineControl SystemHydraulic cutter--------Receiving table
5, Our service:
1). Service: We could send the technician to your country to fix the machine if you need. The buyer need to pay for all the cost, including: visa, round trip tickets, accommodation, salary of USD 100~120 per day.
2). Payment Term: 30% of the total contract value paid by T/T as down payment, the rest 70% of the total contract value to be paid by T/T after inspection by buyer in sellers factory while before delivery. After finished production, we will inspect the machine and inform the buyer, the buyer send person to inspect goods, then payoff the whole payment before shipping out the goods.
3). Warranty: 12 months During the warranty, the replaceable parts are free, but the buyers need to pay for the shipping fee. We will also send one set CD and specification(Chinese and English) to you with the machine, they can teach you how to operate the machines.
6, MACHINE DETAILS: