Quick Detail
Place of Origin
Model Number
CR877
HS-CODE
39-
Package & Delivery Lead Time
Package
1PC/SHRINK WRAP+COLOR LABEL
Delivery Lead Time
30-40 days (Depends on the Qty) upon receiving the deposit
Detailed Description
Folding Clothes Drying Rack Metal Standing Clothes Racks For Sale
- - - -
Brand Name | hang on |
Hanger details | Length : 145cm | High: 90cm |
Width: 50cm | |
Description | 1. Item no:CR877 |
2.Unit Packing:1PC/SHRINK WRAP+COLOR LABEL |
3.Production time: 25-35 days (Depends on the Qty) upon receiving the deposit |
4.Materials :Metal & Plastic Part |
5.Payment:T/T, L/C, Weston Union |
Sample
prodiction time | * Make customer satisfied attentively.
* Sample lead time: 7-15 days
* Accept sample order, test order, mix order and big order. |
Packing details | 6pcs/ctn
Carton size:102*52*31CM |
- - - -
METAL HANGERS PRODUCTION PROCESS
SHIPPING
OUR BASIC PRINCIPLES
1.To do things 100%. In our dictionary, there is no word like almost, nearly or Same Same which you might heard a lot from Chinese suppliers. We execute exactly what you need and what you want.
2.To be honest. We will do what we have promised. In the meantime, we will inform you clearly what we cannot do.
3.To be professional. We have our terms for design, for production, for inspection and for shipping.
Q&A
Q: What is the MOQ?
A: 990pcs for our own available designs.
Q: When you ship my order?
A: Around 25-35 days,It depend on the quatity.
Q: How dose your factory do regarding quality control?
A: Quality is priority.We always attach great importance to quality controlling from the very beginning to the very end.
Q: What kind of way to shipping?
A: 1.Express:Door to Door shipping,EMS,DHL,UPS and so on.It will take 5-8 days.
2.Sea shipping:Time by ocean:20-45 days,It depend in destination.
3.Air Shipping:Time by air,Around one week.
MORE PRODUCT PICTURE