Nickel Aluminum NiAl95/5 Thermal Spray Wire
Product Overview:TANKII Brand NiAl 95/5 thermal spray wire is a nickel aluminium alloy characterized by dense coating,high temperature oxidation resistance, heat shock resistance and scratch resistance.This wire has stable chemical composition, low oxgen and high bonding strength.Typical applications for NiAl 95/5 (TAFA 75B)are widely used in arc and flange flame spray systems, Coatings to resist heat and prevent scaling of conventional low alloy steels,Bond coats for improving the adhesion of top coatings,Coatings on moulds in the glass industry.NiAl 95/5 thermal spray wire has high nickel and 4.5~5.5% Aluminum, other chemical
composition see below sheet: Comecial Composition %:
Al |
Ni |
Mn |
Ti |
Si |
Fe |
Cu |
C |
4.5~5.5 |
Bal. |
Max0.3 |
Max0.4 |
Max0.5 |
Max0.3 |
Max0.08 |
Max0.005 |
Mechanical Properties :
Coating Hardness |
HRB 75 |
Bonding Strength |
68.95 N/mm2 |
Deposit Rate |
10 lbs/hr/100A |
Condition |
Solid Wire |
Physical Properties:Main physical properties of NiAl 95/5 thermal spray wire is density, size and melting point.
Density.g/cm3 |
Normal size.mm |
Melting point.ºC |
8.5 |
1.6mm-3.2mm |
1450 |
Typical Deposit Characteristics:
Typical Hardness |
HRB 75 |
Bonding Strength |
Min 55Mpa |
Deposit Rate |
10 lbs/hr/100A |
Deposit Efficiency |
70% |
Wire Coverage |
0.9 oz/ft2/mil |
Packaging & Shipping:For all the thermal spray wire, we packed in 15kg/spool, spool packed in a carton. All the cartons packed in wooden pallet or wooden case.
Of course, certificate is necessary. The certificate will be packed with your order.
FAQ:
1. What's the min order of Thermal spray wire? We accept min 30kg (2 spool) for one order.
2. Can we get a free sample? If we have thermal spray wire in our stock, we can offer it to you, but the freight is at your sides.
3. For small amount, how can we pay it? We have paypal and western union for small amount.
4. If we don't have Express Account, such as DHL, FedEx, TNT..how should we do? We will delivery goods to you in our account, what you should do is paying the freight to us before shipment.