High strength polished brass stair nosing for stair step

본문 바로가기


Home > Product > High strength polished brass stair nosing for stair step
Product
High strength polished brass stair nosing for stair step
Posting date : Aug 29, 2016
Membership
Free Member Scince Jul 13, 2015
FOB Price
11
Min. Order Quantity
100M
Supply Abillity
10000M/Month
Port
Shanghai
Payment Terms
TT
Package
Plywood box
Keyword :
Category
Contact
Lucia Liu
          0 likes     
Product Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
Meishuo
Model Number
MSSNB-1
HS-CODE
7403-21
Package & Delivery Lead Time
Package
Plywood box
Delivery Lead Time
10-15 days
Detailed Description

 

 

 

Product

stair nosing

Material composition

aluminum profile with carborundum strips inserts

Color

black, blue, green golden etc. or customized

Overall dimensions

75mm wide x 25mm nose

Length

Standard: 3 m, Max: 6 m or customized

Certification

ISO 9001 2008; SGS

Sample time

Normal models: 5-7 working days

Delivery time

Normal models: about 10-15 working days depends on quantity

Payment Term

L/C, T/T, WESTERN UNION, MONEY GRAM

application

concrete, tile, timber ,carpet

 Brass (11).jpgMSSNA-8.jpgQQ20150916155921.jpgQQ20150916155952.jpg

 

 

 

 Extremely durable, full 5 year Guarantee

 

♦ Totally Waterproof and Weatherproof against all kinds of conditions

 

♦ Bonding System adheres to all types of surface and eliminates metal vibration

 

♦ Pre-cut and pre-drilled for simple, quick, and easy site fixing to any substrate

 

♦ Kit can be supplied with masonry drill bit, driver and special self-tapping screws that will drive into drilled concrete.

 

STEP 1: Pour the concrete to form stairs. Schedule pours to allow safety stair treads to be installed quickly before initial set occurs. Make sure you have the required number of safety treads before pouring concrete. 

 

STEP 2: Select one of the stair nosings and place the nosing, with attached anchors, into the fresh concrete. Ensure that the front edge of the nosing is flush with the riser form or at the dimension indicated on the architectural drawings.

 

STEP 3: Gently work the nosing into the concrete until the back edge of the nosing is level with the finished edge of the tread. Work the nosing into the concrete until it is level, plumb, flush with the tread, and at the proper elevation. To provide a stable installation ensure that the stair nosing anchors are securely set in the concrete and that the concrete is completely surrounding them

 

STEP 4: Repeat the procedures given in Step 2 and Step 3 above until all the stair nosings are installed and properly positioned.

 

STEP 5: After the concrete has taken its initial set, remove the riser forms and finish the concrete riser flush to the stair nosing front or as otherwise specified. This is important to ensure that the riser has a clean finish.

 

STEP 6: Stairway must be closed for a minimum of twenty-four (24) hours or until concrete has cured.

 

 

-32.jpg QQ20150706163959.jpg

 

Other stair tread for your choice(just click for more details):

       


ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top