1) NIickel chromium resistance wire 2)Tube material SS304/316/321/Incoloy 3)high efficient heat transfer
Product Description:
Topright Brand finned tubular heaters provide rapid heat transfer for natural convection or forced air
space heating in industrial process air heating systems.
Finned tubular heaters start out as a standard tubular heater with the fins being attached
on a custom built finning machine.
Features:
Mild steel sheath models are suitable for operating temperatures to 500C
Premium grade magnesium oxide insulation imbeds the resistance wire coil for optimum heat transfer
High temperature nickel chromum resistance wire
Full brazed wound fin
Standard and custom options available
Standard size and material |
|
Specifications |
|
Standard diameter: 11mm |
Standard fin diameter: 23mm |
Material: 304SS, 316SS |
Terminations: All Tubular Heater |
Min. Sheath Length: 500mm |
Max. Volts: 480 Vac |
Max. Sheath Length: 256" |
Max. Amperage: 40 Amp |
Specifications 2:
TUBE MATERIAL | FIN MATERIAL | TUBE DIA.(MM) | FIN HEIGHT(MM) | FIN THICKNESS(MM) | FIN PITCH(MM) |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ6.7 |
3-5 | 0.3-0.4 | 3-5 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ8 |
3-5 | 0.3-0.4 | 3-5 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ9 |
3-5 | 0.3-0.4 | 3-5 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ10 |
5-7 | 0.3-0.4 | 3-7 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ12 |
5-7 | 0.3-0.4 | 3-7 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ14 |
5-10 | 0.3-0.4 | 3-7 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ16 |
5-10 | 0.3-0.4 | 5-10 |
SS304/316/321/Incoloy |
S.Steel / mild Steel |
Φ20 |
5-10 | 0.3-0.4 | 7-10 |
Typical Applications:
Caustic Cyanide used in gold processing
Hot water storage
Asphalt Wax
Caustic solutions Detergent
Sterilizing equipment
Heating oils
Plastic processing&packaging machinery
Ovens&dryers
Dies&Tools
Water& Oil heating appliances
Vending machines
Kitchen equipments
Medical equipments
Packaging and shipping:
Our service:
1.Inquiry-Professional Quotation |
2. Confirm the price, lead time, artwork, payment term etc. |
3. Topright sales send the Proforma Invoice with Topright seal. |
4. Customer make the payment for deposit and send us Bank receipt. |
5. Initial Production Stage-Inform the clients that we have got the payment,And will make the products according to your request,. After getting the sample or drawing approval, we inform that we will arrange the production & inform the estimated time. |
6. If possible,middle Production-send photos to show the production line which you can see your products in . Confirm the estimated delivery time again. |
7. End Production-Mass production products photos will send to you for approval. You can also arrange the third party Inspection . |
8. Clients make payment for balance and Topright Ship the goods .Also can accept payment term-Balance against B/L Copy Or L/C payment Term which we discussed. Inform the tracking number and check the status for clients. |
Contact information: