Quick Detail
Place of Origin
HS-CODE
28-
Package & Delivery Lead Time
Package
pallet or according to client inquire
Delivery Lead Time
by sea 2011-01-17
Detailed Description
bolt and nut,steel bolts and nuts,fasterners
Hebei TaiE Piping & Equipment Co.,Ltd, Material:
Carbon steel: ASTM A234 WPB, WPC, ASTM A420 WPL1, WPL3, WPL6
Alloy steel: ASTM A234 WP1, WP12, WP11, WP22, WP5, WP7, WP8, WP91
Stainless steel: ASME A312 TP304, 304L, 316, 316L, 309, 310
Standards: ANSI, DIN, JIS, GB, ASTM, JB, SH, YB, SY, HG, API
USE Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc.
mandy mandygxu@gmail.com