Electric vehicle charging pile construction requirements

본문 바로가기


Home > Product > Electric vehicle charging pile construction requirements
Selling leads
Electric vehicle charging pile construction requirements
Posting date : Dec 26, 2023
Membership
Free Member Scince Oct 23, 2021
FOB Price
Official guide price
Min. Order Quantity
From 500 meter
Supply Abillity
5000meter/month
Port
China,Guangdong
Payment Terms
T/T
Package
Wooden frame scrolls
Keyword :
Category
Contact
OMG06
Selling Leads Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
OMG'
Model Number
UL, EN and GB-T Others
HS-CODE
8522-
Package & Delivery Lead Time
Package
Wooden frame scrolls
Delivery Lead Time
15 to 20 Days
Detailed Description

It is understood that the electric vehicle charging station project is a charging place that provides charging for electric vehicles, and many electric vehicles come to charge. Some operational vehicles passing through the area also come to charge. Increase the use value of electric vehicles.



Charging is one of the biggest concerns for electric vehicle users, and it makes sense that regardless of the brand of electric vehicle, after purchasing an electric vehicle, they would seek and purchase a mobile charging cable. The charging kit built into the charging device has been improved over the years, for example: the charging cable used by electric vehicles includes a charging connector, a common socket connector, and a charging cable of different specifications. Solutions provided by professional electric vehicle transmission technology manufacturers.



Charging pile construction requirements: As an electric vehicle charging pile (peg) on the power distribution side of the power grid, the particularity of its structure determines the characteristics of the automated communication system: the measured points are many and scattered, the coverage is wide, and the communication distance is short. And with the development of the city, the network topology requires a flexible and extensible structure, therefore, the selection of electric vehicle charging pile (peg) communication mode should consider the following issues: communication reliability; Construction costs: under the premise of reliability, comprehensive consideration of construction costs and long-term use and maintenance costs; Communication flexibility and scalability - Because the charging pile (peg) has the characteristics of multiple, wide and dispersed control points, standard communication protocols are required.


For more about new energy vehicle charging cable information, Please visit or search: https://www.omgevcable.com




ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top