moisture-resistant wallpaper adhesive primer

본문 바로가기


Home > Product > moisture-resistant wallpaper adhesive primer
Selling leads
moisture-resistant wallpaper adhesive primer
Posting date : Jun 02, 2012
Membership
Free Member Scince Jun 02, 2012
FOB Price
1800-2100 / ton
Payment Terms
TT
Package
ckage: 1L,5L,10L,15L,25L, or according to customer
Keyword :
Category
Contact
Jane lee
Selling Leads Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
HS-CODE
29-
Package & Delivery Lead Time
Package
ckage: 1L,5L,10L,15L,25L, or according to customer
Delivery Lead Time
Within 5 days
Detailed Description
moisture-resistant wallpaper adhesive primer Wall Preparation 1.Walls should be clean before starting. Greasy walls such as those in a kitchen can be washed with a mixture of water and ammonia (equal parts). Soap & water should work for non-greasy walls. 2.Walls should be smooth: spackle nail-holes & dents and sand smooth. Do not use oil-based spackling products as they can bleed through the wallpaper. 3.If the wall is finished with non-flat paint (gloss, semi-gloss, satin, eggshell, or additive designer paints) the adhesive may not stick. Lightly sand the wall, or use a primer sealer for vinyl wallpapers (available at most home decor stores) to pretreat the wall. 4.If the wall has stains or dark colored paint - use a tinted primer-sealer to cover the wall before hanging your papers. Why use wallpaper primer Much like painting, walls need to be prepared to be wallpapered. A primer is used prior to placing new wallpaper in order to ensure adhesion to the wall. Primer/Sealer For damaged walls, the National Guild of Professional Paperhangers advises primer/sealers which soak into walls and seal problem areas. If placing wallpaper on an older wall, make sure to remove any dirt or dust with soap and water. Sanding down any chipped paint will also help the wallpaper rest smoothly. Construction method:Top-down for construction, can be painted by roller or brush. Construction time is different according to wall substrate condition, usually 1-2 times roll painting. (The second time will be done after the painting of first time dryed) 1,The use percent is one 0.5kg add 50%-100% clean water, the paste area can be 15-20 square. 2,The surface dry for this product will spend two hours and actually dry is twenty-four hours. After it dry can pasted second time. 3,Forbid construction when temperature is under 0

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top