10T medium frequency induction melting furnace

본문 바로가기


Home > Product > 10T medium frequency induction melting furnace
Selling leads
10T medium frequency induction melting furnace
Posting date : Jan 21, 2019
Membership
Free Member Scince Jan 05, 2019
FOB Price
1
Min. Order Quantity
1
Supply Abillity
1
Port
1
Payment Terms
1
Package
1
Keyword :
Category
Contact
alisa zhao
Selling Leads Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
1
HS-CODE
-
Package & Delivery Lead Time
Package
1
Detailed Description
1. Melting furnace description
Melting furnace :
The melting furnace mainly comprises a 12-pulse rectifier transformer, an intermediate frequency power supply, a steel shell furnace body and a PLC auxiliary melting management system. The PLC-assisted smelting management system not only displays the real-time data and information of the power supply operation, but also displays the operating status and information of the entire system, and has automatic oven, cold furnace start, fault diagnosis, fault information display and storage, and operation information display. , system status display and other functions.
ZS 11 - 7000 /10-1. 0 * 2 parameters of the rectifier transformer:
Electric furnace capacity (t)
IF power (KW)
Transformer capacity (KVA)
Voltage combination
Connection group label
Impedance voltage (%)
Primary side (KV)
Secondary side (V)
10T
7000
7000
10
1000
Y/d11
6-8
 
Main technical parameters of 10T / 7000kw medium frequency coreless induction melting furnace
A, comprehensive parameters
Serial number
project
Parameter requirement
    1
Melting furnace form
Medium frequency melting furnace
2
Melting furnace use
Used for melting cast iron , carbon steel, etc.
3
Rated Capacity
10T
4
Maximum capacity
10T +30%
5
Operating temperature
1700 °C
6
Smelting material
Cast iron , carbon steel
7
Lower discharge mode
Hydraulic : hydraulic control
9
Working noise
<85 decibels
10
Furnace structure
Steel shell
12
Melting rate
16 T/h
13
Melting power consumption
≤ 52 0±5% kW.h/t ( cast iron 1550 degrees)
14
Melting time
90 minutes / furnace
B, electrical parameters:
Serial number
project
parameter
1
Power supply
7000kw / 6 phase 12 pulse 10T
2
Number of rectifiers
12 veins
3
Inverter
SCR parallel inverter
4
Rated frequency
250 Hz
5
DC voltage
2700v
5
Incoming AC voltage
1000 V
6
IF voltage
3800 V
7
DC
2600A
8
Start success rate
100%
 
Power factor
Greater than 0.92
 

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top